Dedicated to Repairing Sikorsky Rotor Blades
2
ABS started in June 1994 doing S-55 & S-58 blades. History
3
1998 - Pemco needed a shop to complete H-3 blade repairs for an Egyptian contact. History
4
March 29, 2001 - ABS became U.S. Navy qualified for support of the H-3 fleet. Present
5
ABS is currently repairing S-61/H-3 CH-54/S-64 Skycrane UH-60 Blackhawk Westland SeaKing S-55/S-62/S-58
6
FAA Authorizations
7
Authorizations
8
Main Rotor Blades
9
Spar corrosion is dressed out & area cleaned up. Main Blade Repair
10
Blade is X-Rayed for further hidden damage and defects. Main Blade Repair
11
The cuff is removed and area is cleaned before X-Ray. Main Blade Repair
12
Pockets are installed using an alignment fixture. A computerized controller system runs the heater bars. Main Blade Repair
13
Replacement nickel leading edges are installed. Main Blade Repair
14
Cuff installation. Main Blade Repair
15
Bolt holes are machine reamed to.0002 ” pinch fit. Main Blade Repair
16
S6115-20201-1 or -2 converted to -3 Counterweights being changed. Main Blade Repair
17
Blade is painted to operator’s colors and specifications. Stenciling is completed. Main Blade Repair
18
Helium leak detection unit used for final QA of BIM System. Main Blade Repair
19
Static Balance using Electronic Balancer Main Blade Repair
20
Tail Rotor Blade
21
New pocket being installed in ABS designed and built fixture. Tail Blade Repair
22
New nickel abrasion strip installed on spar. Tail Blade Repair
23
Damaged spar attachment bolt holes. Stainless steel bushings installed. Tail Blade Repair
24
Paint applied according to specifications. Tail Blade Repair
25
Blades are balanced using Electronic Balancer. Tail Blade Repair
26
Westland Honeycomb Tail Blade Refurbishment. Typical leading edge damage
27
Westland Honeycomb Tail Blade Refurbishment. Total dis-assembly and inspection of spar prior to buildup
28
Westland Tail Blade after Bonding
29
Westland Tail Blade Completely Assembled
30
Westland Composite Main WD01-29-90250
31
Paint Removal
32
Westland Composite Main WD01-29-90250 Repainted and Balanced
33
Westland Composite Main WD01-29-90250 Balance Difference IncomingAfter Re-Paint Weight212.3 lbs.210.2 lbs. Span Moment37,077 “lbs.36,600 “lbs. Chord Moment976.9 “lbs.963.4 “lbs. Blade had been repainted 4 times. Found 3 sets of stencils This why you do not have interchangability between blades
34
Balance Dynamic vs Static Is it Necessary? Dynamic is essentially the same as ground runs. Cannot simulate forward airspeed. Really all it does is give you a track number to start from.
35
Westland Composite Main WD01-29-90250 Typical erosion damage to leading edge.
36
Westland Composite Main WD01-29-90250 8’ Nickel abrasion strip installed.
37
PROBLEMS
38
Cracks radiating from bolt holes. BIM indicator caught this problem.
39
Corrosion on spar under cuff.
40
Corrosion on spar under abrasion strip Problems
41
Westland built pockets. Problems
42
Westland built pockets. Problems
43
Corrosion damage caused by prolonged storage in a humid environment. Problems
44
Do not stop drill pocket skin cracks. Drill bit went thru skin into spar. BLADE SCRAP. Problems
45
Internal borescope inspection along with an X-Ray is conducted looking for Corrosion. Problems
46
Water damage to honeycomb tail blade. Problems
47
Abrasive blast damage to pocket skin during paint removal. Problems
48
Maintenance Tips
49
Repainting the blade causes the blade to be out of balance. Touch up paint only.
50
Replacement O-rings MS 28775-6 BIM Indicator and Shrader Valve BIM System Maintenance
51
Never - Never - NEVER! Put a wrench on nuts or bolts to check torque. Breaks the seal and causes a leak. BIM System Maintenance
52
1. Believe the indicator. 2. Replace with serviceable one if suspect indicator. 3. Conduct 30-second test to verify operating correctly. Full color change to red within 30 sec. BIM System Maintenance
53
Storage Help Consider the life of the blades during storage. A lot of damage occurs during prolonged storeage.
54
Clean and wipe down with preservative. Wrap up to protect. This one is scrap. Storage Help
55
Bushings installed in spar attachment holes. Repairs
56
ABS initiated nickel plated tip cap repair on Westland Seaking tail rotor blade. Repairs