Download presentation
Presentation is loading. Please wait.
Published byConnor Jolliff Modified over 9 years ago
1
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training presentation Installation
2
OP 300 is delivered in 2 boxes OP 300 delivery content BOX 1 contains - Column and carriage - Accessories - Wall bracket - Manuals BOX 2 contains - Main Support - Rotating unit
3
Pre-installation requirements PC minimum requirements Windows XP Professional with SP2 (32-bit) 2.4 GHz Core 2 Duo dual core processor or equivalent 2 GB RAM 500 GB HDD or larger Gigabit Ethernet (CAT6) One available PCI-Express x16 bus slot for a GPU card 2 available USB ports (hardware key locks) 19" LCD display, 1280 x 1024 Time and persons For complete installation 1 day and 2 persons are needed Installation room Check minimum room size from pre-sales check-list. Physical environment specs in the pre-sales check-list. Unit mounts to the floor and wall with mounting hardware (not supplied). Radiation shielding Local requirements must be met
4
Product dimensions (78.9”) Range: 54.5” to 56.1”
5
Installation overview Stand up the column Attach unit to the wall and / or to the floor Lift the carriage and hang it on the column. Check leveling of the unit Connect all cables and attach exposure button and touch panel Carry out calibration procedure for the unit Install and configure Cliniview For detailed instructions please refer to Installation manual
6
Unpacking the unit; column box
7
Unpacking the unit; overhead box
8
Stand up the column
9
Three mounting variations: With one wall mounting bracket and bolting unit to the floor With two wall mounting brackets -- no floor drilling is needed Note: Base plate and second wall mounting bracket has to be ordered separately With one wall mounting bracket and base plate
10
For the Wall Mounting Bracket: Prior to mounting column to the mounting bracket, ensure that the bracket has room to adjust forward and back, otherwise there will be no room to level the unit front-to- back. Leveling is done after the overhead is mounted onto the column, using levels built into the overhead.
11
Remove the side covers
12
Cut the foam, leave the foam banded onto the overhead
13
Prepare for the overhead
14
Slide the overhead onto the column
15
Pins align the overhead prior to fixing with the bolts
16
Making the connections from overhead to column
17
Connections, continued
19
Mains power, handswitch and Ethernet connections
20
Remote handswitch terminals
21
Remove the packing foam
22
Remove the plywood
23
Remove the brackets
24
Configure the rotation stop Remove rotation stop bracket Rotate the tubearm 90 degrees CCW, as seen from above Reinstall rotation stop bracket
25
Level the unit Levels located in overhead Use column bracket to set level
26
Configuring the mains power jumpers Default 220V configuration 100V, 115V jumpers stored on side panel
27
Install and Wire the GUI
28
Set the column height microswitch
29
Install the side covers
30
Ceph arm mounting hardware
31
Ceph arm mounting brackets
32
Ceph head packaging
33
Mounting the ceph head
34
Level the ceph head
35
Ceph head connections
36
Ceph head connections, continued
37
Host computer video card Reconstruction video card packed in column box Open host computer, remove old video card from PCI slot (A) Locate “Y” power adapter (B) Install “Y” power adapter (C) Plug in reconstruction video card Ensure that two power plugs are connected to video card (D) Locate reconstruction dongle, plug into available USB port on the host computer A B C D
38
Powering on the unit
39
“Push any button” to initialize the unit
40
Configure the host computer’s NIC
41
Launch Cliniview Software
42
Configure Driver Left-ctrl/right click on driver icon to open the driver setup script Enter the IP address of the unit to be controlled
43
Launch S2 Terminal
44
Calibration of the unit How to start: Patient record must be active - select in the control panel - select “Service” in the control panel -check to see if any items have red exclamation points on them – those items must be recalibrated
45
Alignment and QA Tools Pan alignment cone assembly QA PhantomCT Geometry tool Leveling base
46
Acceptance limits Passed Calibration program is successfully done. Move on to next calibration. Not passed Adjustment is still needed. Follow the instructions the image (if any) and take another exposure. Some calibration programs are iterative and demands a few repetitions. Failed System could not decide what adjustment should be done in order for the calibration to succeed. This calibration status is always the result of some error condition. Taking another exposure will not help. The image may give a hint on what the problem is (e.g. no radiation, collimator severely tilted, image data corrupted…).
47
Pan geometry calibration Purpose: Panoramic geometry position calibration Acceptance limits: Passed / Not passed / Failed GUI informs if calibration has passed
48
CT Geometry calibration Purpose: Calibrates ct geometry, needed only with 3D units Acceptance limits: Passed / Not passed / Failed GUI informs if calibration has passed
49
Pan pixel calibration Purpose: Panoramic sensor pixel calibration Acceptance limits: Passed / Not passed / Failed GUI informs if calibration has passed Pan pixel calibration
50
CT pixel calibration Purpose: Performing pixel gain and dead pixel correction Acceptance limits: Passed / Not passed / Failed GUI informs when calibration is passed
51
Other calibration items Confidential, for distributors only51 Perform full calibration if red exclamation points are found on calibration screen Full calibration if ceph arm is added Use S2 service mode command “indicator service clear” to reset calibration period
52
Install the rear cover