SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office
2
Lane Closure System (LCS) An overview
3
Web-based system used to track closures and restrictions on Wisconsin state highways Facilitate data sharing with WisDOT applications that require lane closure data, such as 511 Traveler Information and Oversize/Overweight (OSOW) permitting Improve the completeness, reliability, and timeliness of lane closure data on state highways LCS Objectives
4
What closures should be tracked? – All let projects – Any planned maintenance or permit / utility work closure or restriction When should closures be entered? – 14 days - Project start, full roadway closure, change in width restriction – 7 days - System ramp closure – 3 days - Lane and service ramp closure System Use
5
Data Accuracy & Completing Closures It is critical that all closure information entered in the LCS be accurate – The closure information entered in the LCS is used to: Provide traveler information through WI’s 511 phone system and website http://www.511wi.gov/Web/map.aspx?region=southwest Issue OSOW permits, which has a direct impact on the movement of commerce through WI
6
http://transportal.cee.wisc.edu/closures Web Address
7
Closure Walk Through Type of facility ( mainline, ramp, bridge or system interchange ) Duration type ( daily/nightly, weekly, continuous or long term ) Closure is either a closure or restriction What’s closed ( single lane, left shoulder, left lane, 2 left lanes etc.. ) Closure location If the closure location is not listed, find the closest point and give a direction and distance from OSOW Restrictions ( place any restrictions that OSOW will use when creating routes / issuing permits ) If a full closure is selected, a detour route will need to be entered Other useful information about the closure should be placed in the external facilities box If more than 1 facility will be needed, the add facility button will allow for multiple entries Enter lane width available or height available
8
Work Zone Traffic Control Guides
13
Work Zone Traffic Control Proper Signing
14
Sign sheeting
15
Sign mounting/height
18
Lane closed sign & barricade
19
Unacceptable Message and Sheeting Material
20
Work Zone Traffic Control TC Equipment
21
Portable changeable message sign messaging
22
Arrowboard Condition
23
DRUM Condition
25
Work Zone Traffic Control Flagging
26
FLAGGING Positioning & equipment
27
Flagging positioning & equipment
28
Equipment/material storage
30
Work Zone Traffic Control Personal Safety
31
Safety Apparel Chapter 6
32
Permanent Signing
33
Unacceptable Mounting
35
Standard Specification 637.2.4.2.2 Furnish a sign mounting system from the departments approved products list. Signing contractor should order sign mounting brackets with plenty of lead time. Sign mounting hardware, including mounting brackets are incidental to signing bid item.
36
Approved Overhead Sign Support Mounting Bracket
39
Bid Items for Signs Most Common Types of Reflective Sheeting 637.1220 Signs Type 1 Reflective SH – Large Interstate / Freeway Signs mounted on steel I beams or overhead sign structure 637.2210 Signs Type 2 Reflective H – Regulatory and Directional Signs 637.2230 Signs Type 2 Reflective F – Warning and School Related Signs
40
Sign Manufacture Details in Plan See notes for sign type and sheeting type.
41
Special Sign Details – Shop Drawings are not Required Manufacturer shall use plan details. – Type 1 example
42
Special Sign Details – Shop Drawings are not Required Manufacturer shall use plan details. – Type 2 example
43
Signing and Marking Contact Information La Crosse Office – Iver Peterson – (608) 785-9060 – Eric Glindinning – (608) 795-9909 Madison Office – Erik Nilson – (608) 516-6571 – Jeff Holloway – (608) 516-6437
44
Joe Schneider Traffic – La Crosse Office 608 789-5959 Questions?