Download presentation
Presentation is loading. Please wait.
Published byVanesa Single Modified over 9 years ago
1
Masterthesis project Master thesis project Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry Xiaoxia Chen Production System Xiaojin Qiu Management and Economics of Innovation Volvo Technology Chalmers University of Technology
2
I am looking for a job now, if you need a smart and diligent employee in LEAN, welcome to contact: chnxiaoxia@yahoo.com.cn Xiaoxia ChenXiaojin Qiu Trainee at SKF, China operation.
3
Agenda Introduction Generation and implementation of evaluation method Conclusion Limitation Discussion Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry Volvo Technology Chalmers University of Technology
4
Introduction - Background (lean & environment) - Aim (Research questions ) Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
5
Case study: - Study visit (video, pictures) - Survey - Observation - Avix (time study), Spaghetti diagram (MH analysis) and so on Focus group discussions Research Methodology and Tools Interview Literature review Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
6
Volvo Technology Chalmers University of Technology Research Methodology and Tools Interview
7
Volvo Technology Chalmers University of Technology Research Methodology and Tools Literature review
8
Generation of Evaluation Method MethodsChooseAdvantagesDisadvantages Life Cycle Assessment √ Life cycle thinking; Widely used Variable; Detail level Value Stream Mapping √ Visualized; Holistic view; Easy to understand; Compatibility Same unit needed; One flow Lean Assessment X Well roundToo detailed Training needed; Loss Model √ Visualized; Easy to understand Same unit needed Avix (video recording analysis) √ Easy to understand; Visualized Time consuming; Training needed Spaghetti diagram (MHA) √ Easy to understand; Visualized (software work) Questionnaires √ First hand information; Reliable/Practical Time consuming Subjective; Volvo Technology Chalmers University of Technology
9
Environmental impacts KPI – Key Performance Indicator How are KPIs selected in Volvo – Group and plant level How KPIs are selected in the evaluation method : - Depends on process - Focus on input and output Life Cycle thinking Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
10
Evaluation method Step 1: Boundary definition Step 2: Measure the production performance and Environmental impacts both before and after lean implementation in VSM Step 3: Visualize the Environment performance by using Loss model Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
11
Evaluation method Step 1. Boundary definitio n Case study illustration Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
12
Evaluation method Step 2: Measure the production performance and Environmental impacts both before and after lean implementation in VSM Case study illustration Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
13
Volvo Technology Chalmers University of Technology Current MH-VSM
14
Volvo Technology Chalmers University of Technology Current state
15
Volvo Technology Chalmers University of Technology Current state
16
Volvo Technology Chalmers University of Technology Avix analysis Material handling analysis Item category Replenishment strategy Price Size Suppliers Current state analysis
17
Avix (time study) Task and operations for the bracket 1 assembly for D6 in station 300. Activity analyses for one of the operation Result for station 300 Volvo Technology Chalmers University of Technology
18
Material handling analysis (Spaghetti diagram) Volvo Technology Chalmers University of Technology
19
Lean implementation Suggestion 1: Get rid of the wood pallets Non-investment solution: Replace with gray box Volvo Technology Chalmers University of Technology
20
Suggestion 2: Add containers on carrier (commons used items) Engine illustration Consoles Added containers Volvo Technology Chalmers University of Technology
21
Move the gasket to the turbo cart (Sequence together) Suggestion 3 Volvo Technology Chalmers University of Technology
22
Suggestion 4: Move the plastic waste bin to the cart Volvo Technology Chalmers University of Technology
23
Suggestion 5: Replace the paper boxes with plastic container Volvo Technology Chalmers University of Technology V-EMB 500 V-EMB 750
24
Future state Volvo Technology Chalmers University of Technology
25
Future state Volvo Technology Chalmers University of Technology
26
Results from improvements Production efficiency (11 8 min.) Station size Movements frequency Feeding frequency
27
Production efficiency Volvo Technology Chalmers University of Technology
28
Station size Volvo Technology Chalmers University of Technology
29
Movements frequency (Spaghetti diagram) The spaghetti diagram of the operator’s movement (current state) The spaghetti diagram of the operator’s movement (future state) Volvo Technology Chalmers University of Technology
30
Feeding frequency
31
Volvo Technology Chalmers University of Technology Future MH-VSM
32
Evaluation method Step 3: Visualize the Environment performance by using Loss model Case study illustration Volvo Technology Chalmers University of Technology Losses Time Valued operating time Internal handling & transportation time External transportation time Administration Time in storage Others Valued operating time Necessary environmental impacts ELU Energy Material Transportation Chemicals Others Losses Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
33
Loss model Loss definition Define loss category Loss is “anything other than the minimum amount of equipment, materials, parts, space, and worker’s time which are absolutely necessary to add value to the product.” - Shoichiro Toyoda, President, Toyota Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
34
Loss model Loss definition Define loss category Loss is “anything other than the minimum amount of equipment, materials, parts, space, and worker’s time which are absolutely necessary to add value to the product.” - Shoichiro Toyoda, President, Toyota Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
35
Loss model - Production perspective: Divided by categories: Overview: Volvo Technology Chalmers University of Technology
36
Loss model - Production perspective: Divided by categories: Overview: Volvo Technology Chalmers University of Technology
37
Loss model -Environment perspective: Divided by categories: Overview:
38
Volvo Technology Chalmers University of Technology Loss model - Comparison Production: Environment:
39
Conclusion Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry Volvo Technology Chalmers University of Technology
40
Limitation Research limitations – Lean Environment – Lean implementation in production Environment NOT lean Environment Information limitations - Interviewees: access and knowledge - Literature review Time limitations – No time to see the future state Volvo Technology Chalmers University of Technology Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry
41
Discussion Applicability in other processes Machining? Assembly Painting? Or Other processes? Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry Volvo Technology Chalmers University of Technology
42
Discussion Difficulties - The implementation of MH – VSM To sum up different item flows into one flow - Loss model modification (definition of categories) The definitions of categories both in production and environment Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry Volvo Technology Chalmers University of Technology
43
Discussion MethodsTo be usedNotes Avixdepends Manual work Spaghetti diagramdepends MH / operation movements Questionnairedepends Purpose Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry Volvo Technology Chalmers University of Technology
44
Discussion Future study - More case studies to verify the evaluation method - Continuous improvement - Implement lean concept into environmental care (make use of the relationship between lean and environment ) Evaluate the Environmental Impacts of Implementing Lean in the Production Process of Manufacturing Industry Volvo Technology Chalmers University of Technology
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.