Exploring Optimal Locations for Underwater Turbine Emplacement near Marine Navigation Passageways Steps to a “go” or “no” answer. With Thanks to: MIT Sea Grant, the Chewonki Foundation, Mass Maritime Academy, Town of Hull, MA USGS, Falmouth Scientific Inc. Geoff Cowles, Dorothy Kelly, Peter Arnold, Stanley King, Tom Pham, Herman Gustafson, Jim Manning, Kurt Bornheim, Andy Stern, Neil Ganju, ….
2
Studies Done at Three Sites
3
The Three Sites Mass. Maritime/ Cape Cod Canal
4
The Three Sites The Hull Gut
5
The Three Sites The Sheepscot River
6
Site #3 The Sheepscot River
8
FERC Permit Area
9
Step 1 Hydrodynamic Modeling
11
The Island Tidal Node
13
Tidal Power Distribution
15
Step 2 Spatial Velocity Survey
16
Surveyed Areas Our sampling focused on five areas, indicated by the sampling sites (green dots) shown here. These areas were identified as high energy locations by a numerical model and by the data from a preliminary survey conducted on September 28.
17
The Surveying Equipment Acoustic Doppler Current Profiler (ADCP) R/V Seagull and Capt. Stanley King
18
Surveyed Areas The Best Area
19
Under the Bridge The focus here will be on the tidal flows and tidal power near the Westport Island bridge.
20
Capturing the Tidal Cycle Observations out of the Nav. Channel, but with bottom depth > 7m
21
The Tidal Cycle The tidal velocity nicely follows a sinusoidal cycle, with maximum ebb (positive) and flood (negative) currents of slightly greater than 1 m/s. Velocities were somewhat higher directly underneath the bridge (by about 10 %), but this is a minor point.
22
Not the Strongest Tides of the Year But wait! The timing of our survey was based on boat and personnel availability. Unfortunately, this availability did not coincide with a time of strong tides. In fact, our survey was conducted during unusually weak neap tides, as seen by highlighting the time of our survey (in red above) on a plot of tidal height at Wiscasset.
23
Extending the Analysis to Other Tides With a little math, we can relate the maximum tidal velocity, Vmax, to the mean power density over the half tidal cycle. The formula is : = 2ρVmax 3 3π Assuming that Vmax is proportions to the height range, H diff, of a particular tide Vmax = H diff*Vmax(Sept 30) 7 ft Allows for the computation of the expected velocity and power distribution under the bridge.
24
For Vmax(Sept 30) = 1 m/s ; year = 623 W/m 2
25
Step 3 Evaluating the Bottom Conditions -Side Scan Surveying
26
Maine DMR Side-Scan Survey April 5,2011
27
Refining the “Best Spot” Assessment
28
Step 4 Installing a Moored Velocity Profiler (e.g. ADCP) Near the Best Spot
29
ADCP
31
Conclusion
32
Conclusion A four-step process: 1.Hydrodynamics modeling 2.Ship-board velocity surveying 3.Side-scan sonar surveying 4.Moored velocity profiling Offers a cost-effective way to evaluate the tidal resource in a estuarine environment, with a “go” or “no” assessment at each step