PBES Seismic Research at the University of Washington John Stanton, Marc Eberhard, Kyle Steuck, Jason Pang, Todd Janes, Olafur Haraldsson, Hung Viet Tran, Phillip Davis, Gunnsteinn Finnsson, Jeffrey Schaefer. University of Washington FHWA P2P Exchange Workshop, Seattle, 2011.11.15
2
Partners WSDOT WSDOT Berger-ABAM Berger-ABAM Concrete Technology Corporation Concrete Technology Corporation Tri-state Construction Tri-state Construction
3
Acknowledgments FHWA (Highways for Life) FHWA (Highways for Life) WSDOT WSDOT PEER PEER TransNOW TransNOW Valle Foundation Valle Foundation PacTrans PacTrans NSF-NEES NSF-NEES
4
Objective Develop a family of seismic bridge PBES connections for: Rapid construction Rapid construction Superior seismic performance Superior seismic performance Designers can mix and match connections to suit local conditions.
5
Key Elements 1. Large bars grouted in ducts. (Rapid construction)
6
Key Elements 2. Socket connections. (Rapid construction)
7
Key Elements 3. Unbonded pre-tensioned columns. (Seismic performance)
8
Construction Procedure 1) Excavate footing.
9
2) Position and brace precast column. Construction Procedure
10
3) Place footing reinforcement and cast. Construction Procedure
11
4)Set cap-beam, grout bars into ducts. Construction Procedure
12
5) Place girders, diaphragms and deck. Construction Procedure
13
Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails
14
Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails
15
Large Bar Connection (Cap Beam) Bars grouted into ducts. Bars grouted into ducts. Few, large bars simplify fit-up. Few, large bars simplify fit-up. Is development length a problem? Is development length a problem?
16
Large Bar Connection (Cap Beam) #18 Bar Anchorage Tests - Pullout tests. - Need 6d b to develop yield, 10d b to develop fracture. - Bar can easily be anchored within cap beam.
17
Large-Bar Connection Cyclic Lateral Load Testing
18
Large-Bar Connection Failure occurs in the column. Failure occurs in the column. PC Connection behaves the same as c.i.p. PC Connection behaves the same as c.i.p. Cyclic Lateral Load Testing
19
Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails
20
Footing Connection: Construction Headed bars
21
Performance Footing Connection - Performance Headed bars provide good load transfer. Internal forces: Strut and Tie Model.
22
Footing Connection Hooked bars facing out (Conventional cip) Load transfer is tangential to hook. Poor transfer.
23
Spread Footing Connection Vertical (gravity) load. Lateral (seismic) load.
24
Spread Footing Connection Constructability: Column has no projecting bars.Column has no projecting bars. No “form-savers”.No “form-savers”. Easy to fabricate and transport.Easy to fabricate and transport. Note: Top steel not yet in place
25
Spread Footing Connection Structural Performance Terminators provide better anchorage than hooked bars facing outwards.Terminators provide better anchorage than hooked bars facing outwards. Failure occurs in column, not footing.Failure occurs in column, not footing. Seismic performance as good as, or better than, conventional c.i.p. construction.Seismic performance as good as, or better than, conventional c.i.p. construction.
26
Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails
27
Drilled-Shaft Connection
29
DS-1 DS-2
30
Drilled-Shaft Connection Performance depends on spiral in transition region. 100% c.i.p. spiral failure in column.100% c.i.p. spiral failure in column. 50% c.i.p. spiral failure in transition.50% c.i.p. spiral failure in transition. Hoop tension strength of transition region concrete appears to be important. Third drilled shaft specimen (in lab now) has thin concrete in transition region.Third drilled shaft specimen (in lab now) has thin concrete in transition region.
31
Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails
32
Background Unbonded prestressing tendons for elastic restoring force. Yielding steel for energy dissipation. Self-centering structural systems
33
Pre-Tensioned System 1.Pre-tensioning solves corrosion problems perceived to exist in post-tensioning. 2.Pre-tension in a plant. Good QC.Good QC. No special equipment or extra site time needed (compare with post-tensioning).No special equipment or extra site time needed (compare with post-tensioning). 3. Can add rebars for energy dissipation.
34
Pre-Tensioned System PC cap- beam Sleeved strand Bonded strand c.i.p. footing Bonded rebar Cracking plane
35
Test Specimens Footing specimen Cap beam specimen
36
Test Specimens - Footing connection
37
Test Specimens- Footing details Screw-thread adjustment device Load cell Strand chuck Strand sleeve Bonded region Void under column
38
2% drift
39
Load vs. Displacement RC: does not re-center UBPT: re-centers
40
Preliminary Results 1. System re-centers. 2. No strands broke. 3. No loss of strand bond. 5. Damage to concrete at interface, possibly promoted by stub bars from footing.
41
New pre-tensioned specimen in lab now: New pre-tensioned specimen in lab now: 1.Use HyFRC (Hybrid fiber reinforced concrete) in the plastic hinge zone to reduce crushing. 2.Use stainless steel rebars to increase drift capacity and energy dissipation.
42
Thank You
47
Background Accelerate on-site bridge construction. Use precast concrete components. Connection details: seismic-resistantconstruct
48
Column-to-Cap-Beam Connection
49
Precast column Precast cap beam 6 # 18 rebar 8.5” corrugated steel ducts High strength grout Cap-Beam Connection: Large bars
50
Column-to-Footing Connection
51
Pre-Tensioned System
57
2% drift
58
6% drift
59
Spread Footing Connection after seismic testing Foundation undamaged. Foundation undamaged.
60
Spread Footing Connection – Gravity Load Test (Damaged) column crushed at: 3.5 * (1.25DL + 1.75LL). No damage to footing. No sign of punching failure.
61
SF-1 H f /D c = 1 Slots in column base More diagonal rft. 100% Caltrans stirrups SF-2 H f /D c = 1 No slots Less diagonal rft. 50% Caltrans stirrups
62
Spread Footing Thickness SF-1 and SF-2. H foot = D col SF-3. H foot = 0.5 D col
63
SF-1 H f /D c = 1.0 Slots in column base More diagonal rft. 100% Caltrans stirrups SF-3 H f /D c = 0.5 No slots Less diagonal rft. Heavy beam shear reinforcement
64
SF Movie
65
After testing. SF-3
67
DS-1 100% transverse reinforcement in transition region DS-2 50% transverse reinforcement in transition region
68
Next Steps: Next Steps: 1.Test pretensioned, cap-beam specimen. 2. Bond tests on epoxy-coated strand. 3. Data analysis and design methodologies. Looking Forward: 1. Methodology calibration tests (Grouted ducts, spread footings, drilled shafts) 2.High-performance materials (e.g. ECC at rocking interface).