Presentation is loading. Please wait.

Presentation is loading. Please wait.

Washington State Department of Natural Resources.

Similar presentations


Presentation on theme: "Washington State Department of Natural Resources."— Presentation transcript:

1 Washington State Department of Natural Resources

2  Started with pilot region and division  Stay as much out of the box as possible  3 DNR IT Consultants provide support along with 2 server guys  Find an owner for each region and division  Site collection grew to 40 GB – 200 sites, in < 2 years

3

4  About 5000 pages  Zillions of documents  80 – 100 web editors  Many different web tools  Valiant attempt at consistent navigation  Loose enforcement of content reviews  Redundant content  About 900 pages  1800+ unique documents – and growing  30 trained web editors  20 template pages  Consistent navigation throughout site  Content approval enforced by workflow  Created once and shared across audiences

5  SharePoint  Color choices  Label choices  Deconstructing the old site  Asking for more time and more money  First attempt at launch  Internal adoption  Engaged executive sponsors  Collaborative contractors  User research results  Second attempt at launch  External acceptance

6 PLANNEDACTUAL Budget$300,000$520,000 Schedule8 months14 months Acceptance> 40%82% Ability to make a seamless change to a new administration NonePriceless

7 www.dnr.wa.gov Wendy Huff wendy.huff@dnr.wa.gov

8  32 TRUST BENEFICIARIES, The principal source of this revenue is from the sale of timber  DNR produces 250 timber sales per year with a revenue stream of approximately 200 million dollars  Paperwork load is extremely heavy and time consuming  Forms change often  Document reviews need to take place from many locations  Need corporate memory

9  Workflow creates SharePoint site for timber sale  Permissions transferred from existing Oracle application  Creates and launches Oracle Report - displays Oracle data  Link to mapping system  Master document library  Field notes and compliance document library

10  Custom workflow uses 3 rd party tool to build a PDF review packet that is stored on SharePoint

11  Sale Closeout workflow cleans up site - deletes desired documents and versions  System uses:  MS Office – Including InfoPath  Adobe Acrobat  SharePoint  Oracle database  Cost = $150,000  Planning for next phase – more integration with existing applications and data

12  Started with changing home page only – move entire intranet later  Most agency communication here – no more all-DNR email  Homepage owned by Communications Group  Fewer emails with attachment$

13  Was time consuming process that utilized the US Mail  Easily give permissions to many work groups  SharePoint, Excel, and Adobe Acrobat - Scanner

14  Custom Workflows set ID, link to scanned document, map and FPA

15  Replaced old FileMaker Pro database – MS Access ???  Permissions easily dealt with easily

16  SharePoint column types - data consistency  Created Views for reporting

17  Implement Corasworks  Break up content database  Move remainder of intranet  Test helpdesk solution  Test training solution  Install ETAR into production  ??? Due to staff cuts Dave Wischer david.wischer@dnr.wa.gov 360-902-1367


Download ppt "Washington State Department of Natural Resources."

Similar presentations


Ads by Google