Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011
2
2 nd Community Workshop Overview Project overview and presentation Concept and alternative review Vote on preferred concepts and options We are here to listen!
3
Plumb Lane - Project Limits
4
Project Overview Description: Regional road pavement reconstruction to repair deteriorating roadway Timeline: No sooner than 2012 Opportunities: Neighborhood enhancement with the potential for safety and operational improvements
5
Project History Survey Community Workshop #1, August 31, 2011 Concept and options development
6
Existing Conditions Public right-of-way varies in width; averaging 50-feet; pavement width averaging 24-feet 25 MPH speed limit Average daily traffic is up to 8,100 vehicles just west of Hunter Lake Future 2030 traffic volumes do not warrant additional capacity improvements Regional road serving a variety of stakeholders Urban road with a rural, country feel Serves residents, commuters, bikers, walkers, equestrian enthusiasts No sidewalk, drainage, parking, center turn lane or bike lanes
7
Plumb Lane Crash Data 12 crashes reported in the past 5 years 7 rear-end (2 injuries) 3 angle (2 injuries) 1 sideswipe @ McCarran Boulevard 1 non-collision (possibly weather related)
8
Plumb Lane Existing Conditions Deteriorating pavement. No drainage, sidewalk, or bike lanes.
9
Why is this an RTC Project? Plumb Lane will be reconstructed due deteriorating pavement
10
Project Concepts and Options Pavement Improvements Option 1aOption 1bOption 1c Bike Lanes Option 2aOption 2bOption 2c Shared Use Path Option 3aOption 3bOption 3c
11
Option Considerations 1.Benefits 2.Right-of-way impacts 3.Design and safety considerations 4.Utility impacts 5.Landscape impacts 6.Construction duration
12
Concept 1: Pavement Only
13
Project Option: 1A Pavement improvements only
14
Project Option: 1B Pavement improvements and shoulders
15
Project Option: 1C Pavement improvements, shoulder and parking
16
Project Option Considerations Concept 1 Pavement OnlyPavement, ShouldersPavement, Shoulder, Parking Concept/Option 1A1B1C Pavement Reconstruction Pedestrian Facilities Paved Shoulder Bicycle Facilities Storm Drain Curb and Gutter Paved Parking Center Turn Lane Slope or Drainage Easements ROW Acquisition Tree Removal Fence/Mailbox Relocations Retaining Wall Installations Power Pole Relocations Driveway Reconstructions Physical Constraints Construction Duration (weeks) 6-8
17
Concept 2: Bike Lanes
18
Project Option: 2A Pavement improvements with bike lanes
19
Pavement improvements, bike lanes and curb and gutter Project Option: 2B
20
Pavement improvements, bike lanes, curb and gutter and sidewalk Project Option: 2C
21
Bike LanesBike Lanes, Curb & Gutter Bike Lanes, Curb & Gutter, Sidewalk Concept/Option2A2B2C Pavement Reconstruction Pedestrian Facilities Paved Shoulder Bicycle Facilities Storm Drain Curb and Gutter Paved Parking Center Turn Lane Slope or Drainage Easements ROW Acquisition Tree Removal Fence/Mailbox Relocations Retaining Wall Installations Power Pole Relocations Driveway Reconstructions Physical Constraints Construction Duration (weeks)6-88-1210-14
22
Concept 3: Shared Use Path
23
Project Option: 3A Pavement improvements, parking, shoulders and shared use path
24
Project Option: 3B Pavement improvements, parking, shoulders, curb and gutter and shared use path
25
Project Option: 3C Pavement improvements, parking, curb and gutter, shoulder, shared use path and center turn lane
26
Project Option Considerations Concept 1 Shared Use Path, Shoulder, Parking Shared Use Path, Shoulder, Curb & Gutter Shared Use Path, Shoulder, Curb & Gutter, Center Turn Lane Concept/Option3A3B3C Pavement Reconstruction Pedestrian Facilities Paved Shoulder Bicycle Facilities Storm Drain Curb and Gutter Paved Parking Center Turn Lane Slope or Drainage Easements ROW Acquisition Tree Removal Fence/Mailbox Relocations Retaining Wall Installations Power Pole Relocations Driveway Reconstructions Physical Constraints Construction Duration (weeks)8-1210-14
27
Next Steps Recommend and present enhancements to the RTC Board of Commissioners and Reno City Council Community design workshop Continue outreach throughout design and construction
28
How you can help tonight: Time to Vote! We are here to listen to you. Please share your ideas with us! Thank you!