Download presentation
Presentation is loading. Please wait.
Published byAlize Mullinax Modified over 9 years ago
1
Surcharge Processing QAD, 2010
2
QAD Proprietary Business Issue Short and long term commodity price fluctuations force material suppliers to attempt to recoup costs using surcharges on items such as steel. Manufacturers struggle with how to track these additional costs and ultimately recover the amounts from their customers.
3
QAD Proprietary Business Issue Typical problems described include: – How to capture the surcharges paid to suppliers, and compare that with amounts invoiced and collected from customers? – How to simplify the invoicing process while including a calculation of the appropriate/agreed to surcharge for each individual shipment? – What are the options for Pay/Charge/Absorb? – How does timing impact my ability to match payments with invoices/accruals? – How do I include expected surcharge rates into sales forecasting and margin reporting?
4
QAD Proprietary Traditional Options Supplier side – Record (distribute) surcharge amounts based on supplier invoice information when vouchered in AP Requires manual distribution Not matched to any other elements of the process Customer Side – Container/Line Charges Flat rate, not based on amount shipped – Additional line/trailer amount added to order/invoice Manual process, impacts order entry and invoice processing time/accuracy
5
QAD Proprietary Solution! SMC – “Surcharge Management and Control” Supplier Side – Utilize Logistics Accounting module to accurately accrue for surcharges payable to suppliers, based on amounts included in item cost information, for later reconciliation with surcharges invoiced – Defined accounting to easily reconcile surcharges paid against surcharges collected Customer Side – Leverage existing QAD functionality (Freight Management) to automate calculation and invoicing process based on amount shipped and effective surcharge “rates” – Post automatically to designated GL account for reconciliation
6
QAD Proprietary Solution! SMC - “Surcharge Management and Control” Features: – Calculate surcharge by item weight, or other unit of measure – Automatic processing based on setups by customer/item – Rate maintenance based on effective date ranges – Compliant with discrete orders, customer schedules – Compliant with standard and enhanced shipping – Manual adjustment to charges where required – Warning message for “incomplete” calculation – Facilitates reporting and analysis through “effective date” of surcharge rates
7
QAD Proprietary Solution! SMC – “Surcharge Management and Control” Features cont’d: – Financial Direct to invoice Recorded in specific GL Account Taxable or non-taxable Optionally discounted based on payment terms discounts Options for invoicing: – Add to trailer – Add to Item Price – Calculate and show (no charge) Options for pricing: – Base Charge – Amount per UM over Min – Amount per UM – Combined
8
QAD Proprietary Trailer Codes
9
QAD Proprietary Surcharge Terms
10
QAD Proprietary Surcharge Class
11
QAD Proprietary Surcharge Zone
12
QAD Proprietary Surcharge List
13
QAD Proprietary Surcharge Rate
14
QAD Proprietary Customer Assignment
15
QAD Proprietary Item Assignment
16
QAD Proprietary Order Entry (discrete)
17
QAD Proprietary Order Entry (discrete)
18
QAD Proprietary Order Entry (discrete)
19
QAD Proprietary Order Entry (discrete)
20
QAD Proprietary Order Entry (schedule)
21
QAD Proprietary Standard Shipments
22
QAD Proprietary Standard Shipments
23
QAD Proprietary Standard Shipments
24
QAD Proprietary Standard Shipments
25
QAD Proprietary Enhanced Shipping
26
QAD Proprietary Enhanced Shipping
27
QAD Proprietary Invoicing Invoicing flow is not impacted by this process. Should manual adjustments be required to the invoice based on errors in calculation, use Pending Invoice Maintenance to recalculate or adjust the trailer amounts. Select Calc Surcharges option in PI Maintenance to have the system recalculate the surcharges based on the updated List information, or manually adjust the amount in the trailer code..
28
QAD Proprietary Setup Considerations – Trailer codes (2.9.13) for tracking surcharges to specific GL accounts – Surcharge List (2.20.1), Class (2.20.7), Zone (2.20.4), Rates (2.20.10), Terms (2.20.13) – Customer linkage to List, 2.1.1 – Item linkage to class, 1.4.5 – Item ship weight and UM (pt_ship_wt and pt_ship_wt_um), can be other than LBs for creative calculation, i.e. fuel or other surcharge – Screen labels, menus and field name changes, change, hide, default, configure screens and field security (Labels - 36.4.17.5, menus 36.4.4, Message Maintenance 36.4.7, error message 669). These elements must be considered as a part of any upgrade plans, as these changes will not be carried into the new upgraded instance.
29
QAD Proprietary Menu System Maintenance, 36.4.4
30
QAD Proprietary Label Master Maintenance, 36.4.17.1
31
QAD Proprietary Label Detail Maintenance, 36.4.17.5
32
QAD Proprietary Message Maintenance, 36.4.7
33
QAD Proprietary System Demonstration
34
QAD Proprietary Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.