Download presentation
Presentation is loading. Please wait.
Published byMegan Look Modified over 9 years ago
1
BalticGrid Project BalticGrid SIXTH FRAMEWORK PROGRAMME RESEARCH INFRASTRUCTURES COMMUNICATION NETWORK DEVELOPMENT INTEGRATED INFRASTRUCTURE INITIATIVE Per Öster Kungl Tekniska Högskolan Stockholm, Sweden <per@pdc.kth.se
2
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 2 BalticGrid Facts ■ Partners: 10 Leading institutions in six countries in the Baltic Region and Switzerland (CERN) ■ Budget: 3.0 M€ ■ Coordinator: KTH, Stockholm ■ Duration: 30 Months Started 1 November 2005
3
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 3 Partners ■ Estonian Educational and Research Network, EENet ■ Keemilise ja Bioloogilse Füüsika Instituut, NICPB ■ Institute of Mathematics and Computer Science, IMCS UL ■ Riga Technical University, RTU ■ Vilnius University, VU ■ Institute of Theoretical Physics and Astronomy, ITPA ■ Poznan Supercomputing and Networking Center, PSNC ■ Instytut Fizyki Jadrowej, im. Henryka Niewodniczanskiego, Polskiej Akademii Nauk, IFJ PAN ■ Parallelldatorcentrum at Kungl Tekniska Högskolan, KTH PDC ■ CERN
4
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 4 Baltic Grid Infrastructure
5
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 5 Core Grid Services Number of Issued Certificates from Project Start ■ BalticGrid CA ■ Multiple VOMS ■ Multiple RB ■ BDII (top) ■ LFC ■ …
6
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 6 Monitoring and Tests ■ SFT Tests run within BalticGrid ■ Tests have started with SAM ■ BalticGrid own stress test
7
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 7 Support Ticketing System
8
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 8 Application Support ■ Migrating Desktop as general platform for application support ■ PnP UI for Dalton users based on Zeus Grid Toolkit
9
EGEE’06 SEEGRID Concertation Meeting September 28, 2006 9 MPI Support ■ MPI support requested for several applications ■ Specific task set up as collaboration between Operations and Applications activities to fix the situation ■ Work in progress to follow at: http://www.balticgrid.org/Grid_Operations/technicalguides/MPI_in_Baltic Grid
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.