1
November 20041 SLS RFM and RNG REPORT 18 November 2004
2
November 20042 AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH WG & BOF C.CROSS-AREA TECHNICAL ISSUES D.OTHER ISSUE AND CONCERNS E.PROPOSED AREA RESOLUTIONS/ACTION ITEMS
3
November 20043 1.RFM WG 2.RNG WG A.LIST OF CURRENT WGs AND BOFs WITHIN AREA AREA REPORT
4
November 20044 B.SUMMARY TECHNICAL STATUS 1.RFM WG Goal: align 401.0-B with WRC-03, SFCG-23 and SFCG-24 Working Group Status: Active Working Group Summary Situation: Working Group Summary progress: 13 +2 (editorial) revised recommendations generated in October; Agency review on 24 recommendations completed; Agreed way forward to resolve deadlock on recommendation 2.4.18 found. White 2.4.18 drafted in accordance with SFCG 14-3R6 to remain white until after SFCG-25 meeting in October 2005; status:OKCAUTIONPROBLEM comment:Good progress AREA REPORT
5
November 20045 B.SUMMARY TECHNICAL STATUS 1.RFM WG Working Group Summary progress: small number of revised recommendations expected in Spring 2005, following on-going simulation results and joint RFM WG-CC WGs meeting. Problems and Issues: Requirement to await SFCG-25 completion before finalizing white 2.4.18 to avoid same problems of current 2.4.18 need to delay WG termination date from August 2005 to end of November 2005. Green Book containing Earth station characteristics (411.0-G-3) dated May 1997 does not reflect current capabilities and may mislead users. Updating it is a difficult and time-consuming job requiring a senior person with intimate technical knowledge of Earth station equipment design. NASA/JPL maintained it in the past. AREA REPORT
6
November 20046 B.SUMMARY TECHNICAL STATUS 2.RNG WG Goal: issue blue book on novel ranging techniques Working Group Status: Active Working Group Summary Situation: Working Group Summary progress: Agency review on delta-DOR recommendation completed; Independent theoretical analysis and simulation results on most regenerative PN ranging specs available from two Agencies; Four (+one) different ranging schemes identified as possible candidates for regeneration; status:OKCAUTIONPROBLEM comment:Good progress AREA REPORT
7
November 20047 B.SUMMARY TECHNICAL STATUS 2.RNG WG Working Group Summary progress: Preliminary hardware results on a subset of the four options available from one Agency; White book (Issue 1) to be issued by July 2005 is being written with focus on regenerative PN codes; Transparent PN codes will be addressed after WB issue 1 is out. Problems and Issues: None so far. AREA REPORT
8
November 20048 A.None C.CROSS-AREA TECHNICAL ISSUES AREA REPORT
9
November 20049 D.OTHER ISSUES AND CONCERNS A.None AREA REPORT
10
November 200410 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 1 : SLS-RFM-R-0410-001 Considering that: 1.The following 23 editorially revised recommendations were subject to Agency review: 2.1.8B, 2.2.4, 2.2.6, 2.3.3A, 2.4.6, 2.4.7, 2.4.9, 2.4.14A, 2.4.14B, 2.4.15A. 2.4.15B, 2.4.16, 3.1.1, 3.1.6B, 3.2.1A, 3.3.1, 3.3.2A, 3.6.2A, 4.1.5, 4.2.1, 4.2.2, 4.2.3 and 5.1. And recognizing that: 1.No RIDs were received during the review period The RFM WG resolves that: these 23 recommendations be raised to blue status and inserted in 401-0 ACTION ITEM 1: SLS-RFM-A-0410-001 SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert the 23 above mentioned editorially revised recommendations in blue book 401-0. AREA REPORT
11
November 200411 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 2 : SLS-RFM-R-0410-002 Considering that: 1.Revised recommendation 2.4.10 was subject to Agency review; And recognizing that: 1.One RID was received during the review period, discussed during the Fall 2004 meeting, and disposed of The RFM WG resolves that: revised recommendation 2.4.10 be raised to blue status and inserted in 401-0 ACTION ITEM 1: SLS-RFM-A-0410-002 SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert revised recommendation 2.4.10 in blue book 401-0. AREA REPORT
12
November 200412 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 3 : SLS-RFM-R-0410-003 Considering that: 1.The following 13 revised recommendations were agreed upon during the Fall 2004 meeting: 2.1.3B, 2.1.4B, 2.1.7B, 2.3.2, 2.3.3A, 2.3.3B, 2.3.4A, 2.3.4B, 2.4.6, 2.4.14B, 2.4.17B, 3.1.2B, 3.3.3A. And recognizing that: 1.Proposed revisions are to bring such ‘old’ recommendations in line with current CCSDS agencies’ practice The RFM WG resolves that: these 13 recommendations be raised to pink status and be submitted for Agency review ACTION ITEM 1: SLS-RFM-A-0410-003 SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to initiate Agency review of the above mentioned 13 revised recommendations. AREA REPORT
13
November 200413 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 4 : SLS-RFM-R-0410-004 Considering that: 1.Minor editorial changes to recommendations 2.4.2 and 2.3.5 were agreed upon during the Fall 2004 meeting. And recognizing that: 1.Submitting editorial changes to Agency review is an unnecessary waste of already constrained Agency resources The RFM WG resolves that: editorially revised recommendations 2.4.2 and 2.3.5 be raised to blue status and inserted in 401-0 ACTION ITEM 1: SLS-RFM-A-0410-004 SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert the 2 above mentioned editorially revised recommendations in blue book 401-0. AREA REPORT
14
November 200414 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 5 : SLS-RFM-R-0410-005 Considering that: 1.The Green Book containing Earth station characteristics (411.0-G-3) dated May 1997 does not reflect current capabilities and may mislead users. 2.The document represents a resource used by many organizations planning new missions. In the past, NASA/JPL provided the book captain function and would consider doing so again, provided that the necessary resources were made available. The RFM WG resolves that: CESG/CMC be alerted about status of 411.0-G-3 so that necessary resources are made available for the appropriate organization to update it. ACTION ITEM 1: SLS-RFM-A-0410-005 SLS AD alert by 01 Dec 2004 CESG/CMC to consider obtaining necessary resources for the appropriate organization to update 411.0-G. AREA REPORT
15
November 200415 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 6 : SLS-RFM-R-0410-006 Considering that: 1.A very difficult situation with recommendation 2.4.18 is being solved by a white 2.4.18 written along the lines of SFCG recommendation 14-3R6; 2.Such SFCG rec is up for final approval at SFCG-25 (October 2005); 3.The the activities of the RFM WG are due by August 2005 And recognizing that: 1.Present problems with current 2.4.18 are in the inconsistencies with SFCG which could be again the case with new white version The RFM WG resolves that: the WG schedule is extended until end of November 2005. ACTION ITEM 1: SLS-RFM-A-0410-006 SLS AD seek by 01 Dec 2004 agreement of CESG/CMC on RFM WG 3-months schedule extension. AREA REPORT
16
November 200416 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 1 : SLS-RNG-R-0410-001 Considering that: 1.Revised recommendation 2.5.6B was subject to Agency review; 2.No RIDs were received during the review period; 3.Revisions to 2.5.6B stem from current and future delta-DOR practices by ESA and NASA And recognizing that: 1.No other CCSDS Agencies are currently supporting delta-DOR activities The RNG WG resolves that: revised recommendation 2.5.6B be raised to blue status and inserted in 401-0. ACTION ITEM 1: SLS-RNG-A-0410-001 SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert revised recommendation 2.5.6B in blue book 401-0. AREA REPORT