Published bySidney Austen Modified over 9 years ago
1
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS
2
M.N Minard Intermediate rail Lower rail SPD Cable chain Vis à bille Chain support Cable fixing system Top & Bottom
3
M.N Minard SPD cable chain elements Chain support – delivery 15/02 Vis à bille support - delivery 5/04 Rails : - intermediate : 3rd April - lower : 16 March Cable fixing system - Bottom :delivery ~ 10th April - Top : end of April Stabilisation system : delivered
4
M.N Minard SPD installation Vis à bille 2 rail elements needed for chain installation Cryo side : 90% holes drilled. A-side interference with PS cabling Cryo chain support installation : week 15 (10th april)
5
M.N Minard SPD cable chain installation Chain Cryo side : –Chain stabilisation added –Vis a bille also installed Chain A-side : –Interference with Cabling PS –Drill holes (50) : Week 16 –Support mounting : Week 18 Week 15 (10_13 April) Week 18 (30Avril – 5 Mai )
6
M.N Minard Cable Tray Bottom & side cable tray = in place Top cable tray designed : –Test model not yet done – go directly to final one Cable chain entrance M1 Cable chain entrance Fixed on modules
7
M.N Minard Ps –Spd Motorisation Delay due to component delivery Cables installation for motorisation (week 15) Missing component lost at the pit – to be reordered Control command Box at the pit (week 15) Test May. PS/SPD have to be available
8
M.N Minard Other works Works on PS are interfering with SPD installation –PS « vis à bille » installation (week 14) –Consolidate PS cable chain attachement –PS roller adjustement Stabilisation system of ECAL/HCAL –Need a window with ECAL displacement possible –For HCAL : end of May
9
M.N Minard Summary SPD cable chain support in place Cryo side 13 April Critical point : top cable tray; PS/SPD Motorisation available end of April Lead displacement being designed – in place ~20 May
10
M.N Minard From cable tray to rack Section 600 cm2 Needed 340 cm2
11
M.N Minard I I1-21I122I1-23I2-21I2-22I2-23I3-21I3-22 I1-11I112I1-13I2-11I2-12I2-13I3-11I3-12I3-13 I4-31I5-43 I4-21I5-31I5-32I5-33I6-31I6-32 I4-11I4-12I5-21I5-22I5-23I6-21I6-22 I5-11I5-12I5-13I6-11I6-21 Top and bottom are mixed In inner & outer chain Room left for spare & CC EcalRich