Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proyek Multimedia Pertemuan 2 Matakuliah: T0732 / Sistem Multimedia Tahun: 2007.

Similar presentations


Presentation on theme: "Proyek Multimedia Pertemuan 2 Matakuliah: T0732 / Sistem Multimedia Tahun: 2007."— Presentation transcript:

1 Proyek Multimedia Pertemuan 2 Matakuliah: T0732 / Sistem Multimedia Tahun: 2007

2 Bina Nusantara Learning Outcomes Pada akhir pertemuan ini, diharapkan mahasiswa akan mampu : Menguraikan Tahapan dan Kebutuhan Proyek Multimedia

3 Bina Nusantara Outline Materi Tahapan dan Proses Proyek Kebutuhan Proyek Keahlian Multimedia

4 Bina Nusantara “Experience suggests that most projects which fail,do so because of inadequate project management rather than a lack of technology or insurmountable problems” (Brown, 1991 discussing Project Management for IMM Development)

5 Bina Nusantara The Idea Analysis Evaluation / Report Pretesting Evaluation / Report Prototype Development Evaluation / Report Alpha Development Evaluation / Report Beta Development Evaluation / Report Delivery Ship Product Revision Bail Out Focus Group Bail Out The Process of Making Multimedia

6 Bina Nusantara Analyze Analyze the Need1 Analyze the Cost2 Analyze the Content3 Analyze the Market4 Analyze the Technology5 Analyze the Delivery Medium6 Back to The Process of Making Multimedia 

7 Bina Nusantara Pretesting Define Project Goal1 Define Skillset needs2 Create Content Outline3 Position Sales & Marketing4 Create Prototype on Paper5 Back to The Process of Making Multimedia 

8 Bina Nusantara Prototype Development Build Screen Mock–Ups1 Design Content Maps2 Design User Interface3 Develop Story/ Messages4 Test Prototype5 Back to The Process of Making Multimedia 

9 Bina Nusantara Alpha Development Detail the Storyboards & Flowcharts1 Finalize Story Scripts2 Produce Graphic Art3 Produce Sound and Video4 Solve Technical Problems5 Test Working Prototype6 Back to The Process of Making Multimedia 

10 Bina Nusantara Beta Development Distribute to Limited Tester List1 Respond to Bug Reports2 Prepare User Docs3 Prepare Packaging4 Develop Gold Candidates5 Announce to Press and PR Lists6 Back to The Process of Making Multimedia 

11 Bina Nusantara Delivery Prepare Technical Support1 Install Sales Team2 Replicate Gold Master3 Pay Bonuses4 Hold Launch Party5 Back to The Process of Making Multimedia 

12 Bina Nusantara Project Management Model - Luca/Jadav

13 Bina Nusantara Other Project Management Model Approach Waterfall Model Incremental Model Greer – ID Model Spiral Model Barry Boehm, A Spiral Model of Software Development and Enhancement, IEEE Computer, 1988

14 Bina Nusantara Evaluation Formative  during the process of development Summative  After the completion of development Impact  After implementation of the application

15 Bina Nusantara Kebutuhan Proyek Scheduling Storyboard

16 Bina Nusantara

17

18 Multimedia Skills Project Manager Multimedia Designer Interface Designer Writer Video Specialist Audio Specialist Multimedia Programmer Web Producer

19 Bina Nusantara

20

21

22 Q & A


Download ppt "Proyek Multimedia Pertemuan 2 Matakuliah: T0732 / Sistem Multimedia Tahun: 2007."

Similar presentations


Ads by Google