Download presentation
Presentation is loading. Please wait.
Published byBrian Gouldin Modified over 9 years ago
1
Purchase Requisition (PR) Purchase Requisition (PR) Bid Invitation 1.White copy : Finance 2.Pink copy : Filing 3.Green copy : leave in PR book CBA 1.Reviewed by: Admin Operations Delegate (AOD) 2.Approved by: SFR 20,000 USD 3.Preference to have SFR approval on all CBAs for more transparency CoC minutes OFAC check if cost > 1,000 USD) Purchase Order (PO) 1.To: Admin and Operations 2.Estimated price in BoQ 3.Verified by Finance Delegate 4.Initiated by: PO or APO 5.Authorized signature: Watsan Delegate 6.Can be approved by Finance with email initially Contract or MoU 3 copies 1.White copy : Contractor 2.Pink copy : Finance 3.Green copy : watsan filing 4.No photocopies in files 1.Contractor 2.Finance Phuket 3.Watsan filing If contract value 20,000 USD SFR signs 1 st Payment 2 nd Payment 3 rd Payment 4 th Payment 1.Payment Voucher (PV) with contract No. reviewed by Finance Delegate 2.Monitoring form signed by monitoring committees certified by Watsan PC/Delegate 3.Any amendment (if required) 4.OFAC verification 5.Scan contract (cover page, Schedule of payment page- No. 8, signature page) 6.Photocopy of Bank book * Except Bank of Agriculture and Cooperative 1.Payment Voucher (PV) with contract No. reviewed by Finance Delegate 2.Original signed copy of Contract 3.Photocopy of summary sheets Por. Ror 5 (every bidder) 4.Photocopy of CBA(or signed sole source letter) 5.Photocopy of CoC minutes 6.PR (White) 7.PO (Pink) 8.Photocopy of Bank Book* 9.Photocopy of performance guarantee 10.OFAC verification 1.Payment Voucher (PV) with contract No. reviewed by Finance Delegate 2.Letter of Completion signed by contracting parties and evaluation committee 3.Any amendment (if required) 4.OFAC verification 5.Scan contract (cover page, Schedule of payment page- No.8, signature page) 6.Photocopy of Bank book 1.Payment Voucher (PV) with contract No. reviewed by Finance Delegate 2.Retention fee clearance form (six months from issuance of letter of completion) 3.Copy of Letter of completion 4.OFAC verification 5.Scan contract (cover page, Schedule of payment page- No. 8, signature page) 6.Photocopy of Bank book Defect Liability Period - 365 days after issuance of Letter of Completion - begins Sole Source 1.Letter from Watsan Delegate to SFR requesting sole sourcing 2.Reviewed by: AOD 3.Approved by: SFR 1.Address to: Contractor 2.Instructions: Pay by Bank Transfer 3.Consignee: ARC Provincial Office Address: ___________________ 4.Delivery: Project site 5.Authorized by AOD or SFR if > 20,000 USD 1.Invitation via website is encouraged 1.Print out of website in file 2.Memo stating how and where tender 3.Sign-out sheets for potential bidders 4.Bid register WSHPP Payment Flowchart "Nothing on earth is so weak and yielding as water, but for breaking down the firm and strong it has no equal.“ Lao-Tsze IFRC Technical Unit Approval if over 50,000 CHF Notes on payment process 1.Copies of original documents sent by EMS to Phang Nga within Tuesday afternoon 2.Originals kept in provincial files Notes on payment process 1.Copies of original documents sent by EMS to Phang Nga within Tuesday afternoon 2.Originals kept in provincial files Updated 11/06/09
2
WSHPP Payment Flowchart For Contract amendments (reference to page 46 of IFRC Procurement Manual) Amended design drawings and BoQ 2. If design is new and developed by WSHPP, it will need to be approved by a licensed Thai engineer (Provincial Engineer) (this would be the case for new water storage tanks, new toilet facility designs, etc.) Amendment letter with design and BoQ (3 copies) Amendment letter with design and BoQ (3 copies) 1. Completed by TPA in consultation with delegate, beneficiary committee and local authorities Purchase Order 1.White copy : Contractor 2.Pink copy : Finance 3.Green copy : watsan filing 4.No photocopies in files 1.Address to: Contractor 2.Instructions: Pay by Bank Transfer* 3.Consignee: ARC Provincial Office Address: ___________________ 4.Delivery: Project site 5.Authorized by AOD or SFR if > 20,000 USD 1. Signed by Contractor and IFRC representative (signatory on contract ) and approved by Finance Dept if amendment results in increased costs. 3. Kindly follow prescribed WSHPP format – delegate will assist as required Payment made as specified in the amendment 1. Additional costs incurred resulting from any amendment will be added to the 3 rd payment 1.Contractor 2.Finance Phuket 3.Watsan filing Procedures for Amending and Terminating the Contract: Amendments of a contract if required shall be numbered serially, commencing with Amendment No. 1. Each amendment shall identify the contract to which it refers by number, subject and date. The nature of the amendment shall be clearly described and a statement included that all other terms and conditions of the contract shall remain unchanged. The procedures for signing an amendment are the same as for the original contract. If the amendment modifies the expenditure under the original contract or substantially modifies the scope of work and the original contract was reviewed by the Committee on Contracts, the advice of the Committee shall be obtained before the Amendment is issued. (Source: page 46 of IFRC Procurement Manual) 2. Signed by CoC Members as witnesses if amendment substantially modifies scope of work (or if amount exceeds 15,000 Thai Baht/THB) Contract signed by IFRC and Contractor IFRC Procurement Policy * Except Bank of Agriculture and Cooperative Updated 11/05/09 2. The Fourth Payment “retention fee” will then equal 5% of original contract amount plus 5% of the amendment costs. (or 5% of the total overall project costs) E-mail to Finance Delegate to verify Budget
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.