Download presentation
Presentation is loading. Please wait.
Published byDarrius Selman Modified over 9 years ago
2
Receives Disbursement Vouchers from GSO together with supporting documents – 1 min per transaction Tracking Numbers – required for Administrative Officers, Supply Officers, Dept. Heads, Suppliers to track their documents
3
Receiving personnel stamps ADV Nos, Type of Fund, Date received on the face of the voucher and to all supporting documents – 5-10 min/transaction Encodes the ADV No. in the Document Tracking System – 1 min
4
Evaluates/Checks as to completeness of supporting documents, legality and appropriateness of the procurement/transaction o 20 min – 1 hr/ transaction o Gasoline – 1 hr – 2 hr/transaction o Infrastructure Vouchers – 1-2 hrs/transactions Encodes the transaction in the ledger per supplier – 1 min
5
Submits document for review Submits document to City Accountant for approval Forward to releasing
6
Supplies, Rentals, Meals, Gasoline, Equipment, Vehicles and Accessories Competitive Bidding Alternative modes o Shopping o Small Value Procurement (SVP) o Emergency Case o Twice-Failed o Direct Contracting o Repeat Order
7
Obligation Requests Purchase Requests BAC Resolution for mode of procurement duly approved by LCE For Procurement of more than 2M – Minutes of Pre- Procurement Conference
8
For procurement of more than 1M – Minutes of Pre-Bid Conference Invitation to Bid – Philgeps Posting or Newspaper Publication Bidder’s Technical Documents – esp. Bidder’s Bond Bidder’s Financial Proposal Minutes of Bid Opening
9
Abstract of Bids BAC Certification for Results of Eligibility Screening Post Qualification Report Bid Evaluation Report BAC Resolution Declaring Winning Bidder – duly approved by LCE Notice of Award
10
Notice to Proceed – indicating receipt by the supplier Performance Security – before signing the Purchase Order (supplier) o Cash Bond – 5% of contract price o Bank Guarantee – 5 % of contract price o Surety Bond – 30% of contract price
11
Print-out copy of posting of Notice of Award, Notice to Proceed and Contract of Award in the Philgeps Warranty Security against manufacturing defects (patent and latent defects) – 10 % of total contract price o Bank Guarantee o Authorization to deduct retention
12
Minimum period of three (3) months, in the case of expendable supplies, or a minimum of one (1) year in the case of non-expendable supplies, AFTER ACCEPTANCE by the procuring entity of the delivered supplies
13
Acceptance & Inspection Report- Date received must be the actual date when goods where received Charge Invoices For PPE o Property Issuance Slip o Property Acknowledgment Receipt For Inventories o Property Issuance Slip o Inventory Custodian Slip For Supplies o Utilization Report
14
Evidence of Invitation of three (3) observers in all stages of the procurement process pursuant to section 13.1 of the Revised IRR of R.A. # 9184
15
Shopping, SVP, Repeat Order, Twice-Failed Bidding, Emergency Case o Purchase Requests o Purchase Orders o BAC Resolution for mode of Procurement o Canvass – at least 3 eligible suppliers o Abstract of Canvass o BAC Resolution recommending award of contract duly approved by LCE
16
o Statement of prospective bidder that it is not blacklisted or barred from bidding by the Gov’t or any of its agencies, offices, corporations or LGU’s – refer to BAC Secretariat for format o Sworn Affidavit of the Bidder that it is not related to the Head of Procuring Entity (HOPE) by consanguinity or affinity up to the third civil degree – refer to BAC Secretariat for format
17
Additional Requirements o Certification of BAC on the failure of competitive bidding for the second time o Performance Security o Warranty Security
18
Additional Requirement o Justification as to the necessity of the purchase
19
Justification for the necessity of the procurement that can only be done through Direct Contracting BAC Resolution duly approved by LCE for Mode of Procurement BAC Resolution which states that: o Study/survey has been done to determine that there are no sub-dealers selling at lower prices and for which no suitable substitute can be obtained at more advantageous terms to the gov’t
20
o Result of BAC survey (confirmation of exclusivity) o Copy of letter to selected supplier to submit a price quotation and conditions of sale o Certificate of Exclusive Distributorship issued by the principal under oath and authenticated by the embassy/consulate nearest the place of the principal, in case of foreign suppliers
21
Mayor’s Permit Performance bond Warranty Security
22
Copy of the Original Contract used as basis for repeat order indicating that the original contract was awarded through public bidding
23
Certification from the Purchasing Department/Office that the supplier has complied with all the requirements under the original contract Performance Security Warranty Security
24
Unit prices must be the same or lower than those in the original contract, provided such prices are still the most advantageous to the gov’t after price verification The repeat order will not result in splitting of contracts, requisitions, or purchase orders, as provided for in Sec. 54.1 of the Revised IRR of R.A. 9184
25
Except in cases duly approved by the GPPB, availed only within six (6) months from the contract effectivity date stated in the Notice to Proceed arising from the original contract, and Repeat order shall not exceed 25 % of the quantity of each item in the original contract
26
Vehicles o Brochures – technical specifications o GSIS Insurance Policy o LTO OR and Certificate of Registration Repair and maintenance of vehicles
27
o Latest/updated Vehicle Ledger – history of repair o Pre-repair evaluation report and approved detailed plans by the agency showing in sufficient detail the scope of work/extent of repair to be done o Waste Materials Report o Post Repair Inspection o Certificate of Acceptance
28
Certificate of Product Registration from FDA Certificate of Good Manufacturing Practice from FDA Batch Release Certificate from FDA List of Expiry dates duly signed by GSO Inspector and CHO Pharmacist License to Operate
29
RRepresentation Expense - meetings oAoAgenda oMoMinutes of the Meeting oAoAttendance Sheets – duly certified correct TTraining Expense oPoProgram Design oAoAttendance Sheets
30
Number of participants and menu – indicated in the purchase request and canvass Note: per LFC Res # 006-10 Series of 2010 Maximum amount allowed per participant/employee Meals (lunch, dinner) – P 250.00 Snacks – P 75.00
31
Schedule of Pakaon Billing Statement/Invoice Delivery Receipts Acknowledgment from the Brgy. Captain that lugaw was served in their area
32
Sample Cloth Uniform/Shirt Design Program Design Distribution List – duly signed by recipients and certified correct by Dept. Head/Administrative Officer
33
Affidavit of Publication Copy of Published Issue Bill/Statement of Account CD in case of TV/Radio Commercial
34
Complete copy of the building floor plans indicating in shaded colors the rentable space Copy of Certificate of Occupancy of the building or appropriate approved documents showing the date the building was constructed or age of the building
35
CComplete description of the building as to type, kind and class, including its component parts and equipment facilities such as, but not limited to, parking areas, elevators, air-conditioning systems, firefighting equipments, etc. CCopy of the Master of Deed Declaration
36
LList of prevailing comparable property within the vicinity VVicinity Map RRequest for payment BBill/Invoices
37
Agency evaluation of equipment utilization Pertinent data of area of operation Daily Equipment Utilization Report Pictures of the Activity/Project Billing Statment
38
Certificate of Completion (if project was implemented in the Brgy – it should be signed by the Brgy. Captain) Accomplishment Report List of vehicles/equipment rented
39
OBR, P.R., P.O. – same period as the bills/invoices GASTA Statement of Accounts Summary List of Gasoline Consumption note: P.O. must be applicable only for the quarter canvassed/bidded
40
Complete description/specifications (brand name, model, make/country of origin, hp, piston displacement, capacity) and number of units of dump trucks to be used Complete descriptions/specifications (age condition, brand, etc) and number of units of all other equipments to be used
41
AAppropriate approved documents containing the terms and conditions, whether operated or bare rental for heavy equipment, whether per trip or package deal; and other relevant condition TThe designated dumpsite/location MMeasurement in kilometers of the total distance covered by one (1) complete route for all the required routes to be travelled
42
Estimated volume in cubic meters of garbage to be hauled from area of operation, including the basis for such estimates Accomplishment Report Request for payment Contractor’s Bill Certificate of Acceptance Record of Attendance/Service
43
HaulingTrips Summary Summary of Garbage Collection Accomplishment Delivery Receipts of Hauling Accomplishments Delivery Receipts Price Range of Hauling Services
44
Delivery Receipts Statements of Accounts Schedule of Pakaon Acknowledgment by the Brgy. Captain that lugaw was served in their area Summary of Delivery – indicate place and plate number
45
Bidder’s bond Original Official Receipt If winning bidder Signed Purchase Order Performance Bond If losing bidder Waiver from supplier to request for reconsideration BAC Certification (losing bidder)
46
Performance Bond Original Official Receipt Certificate of Acceptace/Cert. Photocopy of Acceptance & Inspection Report
47
Photocopy of paid voucher or indicate ADV Number/Check Number Certification that supplies were fully utilized/consumed and found free from patent and latent defects / post completion reports & inspection report by CEO that construction has no defects – Infra Projects.
48
Pictures of the Project Obr – original copy Letter to COA – 100% completed Statement of Work Accomplished and Time Elapsed Materials Inspection Report Bar Graph Schedule and S-Curve Project Accomplishment Statement
49
Post Completion Report Form 171 – Project Inspection Report Infrastructure Contract Contractor’s Affidavit Notice of Award Notice to Proceed Letter request from supplier for inspection and billing Post Qualification Report Bid Evaluation Report Invitation to Bid Abstract of Bids
50
Revised Program of Works Performance Bond Bidder’s Bond BAC Resolution to Award BAC Certificate of Eligibility Sketch Plan Bid Proposal/Detailed Estimates Change Order/Itemized Revision (if any) Letter Request of Change Order (if needed)
51
Suspension order/Resume Order (if needed) Computation of Liquidated Damages (if delayed) Certificate of Appropriation (from CBO) Note: Retention – if less than 50% accomplished = 10% based on amount of the accomplished portion If more than 50%accomplished = 5% of the total contract price
52
REIMBURSEMENT 1. OBR 2. PURCHASE REQUEST 3. PURCHASE ORDER 4. BAC RESOLUTION AS TO MODE OF PROCUREMENT 5. CANVASS OF PRICES 6. ABSTRACT OF BIDS/CANVASS 7. UTILIZATION REPORT 8. ACCEPTANCE & INSPECTION REPORT 9. REPORT OF DISBURSEMENT 10. OFFICIAL RECEIPTS/ CASH INVOICES
53
MEALS 1. AGENDA/ MINUTES/ PROGRAM DESIGN 2. ATTENDANCE SPORTING GOODS 1. PROGRAM DESIGN 2. REQUEST/ SOLICITATION 3. ACKNOWLEDGEMENT RECEIPT 4. DISTRIBUTION LIST
54
T-SHIRTS 1. PROGRAM DESIGN 2. DISTRIBUTION LIST 3. ILLUSTRATION 4. SAMPLE OF CLOTH SUPPLIES 1. REPORT OF UTILIZATION
55
SEMI- EXPENDABLE SUPPLIES & MATERIALS 1. PROPERTY ISSUANCE SLIP 2. INVENTORY CUSTODIAN SLIP SPARE PARTS, NEWSPAPERS 1. WASTE MATERIALS REPORT
56
REPAIRS-VEHICLES & EQUIPMENTS 1. PRE-POST REPAIR INSPECTION 2. CERT. OF NORMAL WEAR &TEAR 3. A.R.E.
57
REPAIRS- BLDG. 1. COST ESTIMATE 2. ACCOMPLISHMENT REPORT
58
End…….
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.