VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.

Similar presentations


Presentation on theme: "VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI."— Presentation transcript:

1 VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI ASSAF

2 INTRODUCTION VE JOB PLAN Information Phase Functional Phase Creative Phase Judicial Phase Development Phase SUMMARY AND RESULTS OUTLINE

3 INTRODUCTION  VE study of Plumbing for the Villa  A team comprised of 3 professionals  VE  Design  Mechanical  On final implementation  Overall 63% in savings were realized

4 OBJECTIVES  To provide drainage and water service  Minimum performance as required by IAPMO  To fulfill peak load  To provide human comfort for all climates  To drain sewage waste to street mains  To draw water from exterior network and distribute internally  Use locally available material INTRODUCTION

5 INTRODUCTION COST DATA FIXTURES SR 67137.5 PIPING SR 24387.5 GENERAL ITEMS SR 32650 TOTAL SR 124175 FOR THE ORGINAL DESIGN PIPING (supply water) SR 19756.3

6 WHAT MUST IT DO? IDENTIFY PRESENT FUNCTION FUNCTIONAL PHASE WHAT DOES IT NOW DO? SERVICE BUILDING ---SUPPLY WATER ---DRAIN WASTE ---PROVIDE LOOK ---PREVENT POLLUTION SERVICE BUILDING ---SUPPLY WATER ---DRAIN WASTE ---PROVIDE AESTHETIC ---PREVENT POLLUTION ---PROTECT HEAT ---PROVIDE DURABILITY

7 FUNCTIONAL PHASE FUNCTION WORKSHEET WHYHOW FUNCTION SUPPLY WATER To fulfill basic human requirements Through piping network To provide healthy environment to live and work DRAIN WATER Through piping network PROVIDE FIXTURES To provide service and aesthetics Through installation

8 FUNCTION – COST – WORTH FUNCTIONAL PHASE ITEM FUNCTION PRESENT COST(SR) WORTH VALUE INDEX VERBNOUNKIND ALT COST (SR) PIPINGSupplyWaterB20000 UPVC & CPVC 40004.4 PIPINGDrainWasteB4700UPVC40001.175 FIXTURESServiceBuildingB67000CER370001.8 GEN. ITEMSRegulateWaterS70000Brass490001.4 TANKStoreWaterS27500Fiber120002.3

9 CREATIVE PHASE GENERATE IDEAS FOR PIPING TO SUPPLY WATER  Pipes of Copper with insulation  Pipes of Copper without insulation  Pipes of HDPE  Pipes of PPR  Pipes of UPVC and CPVC  Pipes of GI  Pipes of BI  Pipes of GPR

10 JUDICIAL PHASE CWI CW/oI HDPE PPR UPVC & CPVC GI BI GPR CWI 55545 4 6 6 5 4 8 3 4 57 3 4 7 89 8 3 4 89 8 2227 83137 3 883123 22 21 37 27 26 25 24 1 2 3 4 5 6 7 8

11 IDEA COMPARISON JUDICIAL PHASE IDEAADVANTAGESDISADVANTAGESRANKCWI No heat loss High cost CW/oI Easy installation Heat losses and weak HDPEDurable High cost PPR Durable and new technology Requires special device to install UPVC & CPVC Low cost, durable and easy installation Heat loss GPR Durable and easy installation Very high cost

12 DETERMINING WEIGHTS FOR EVALUATION A – Performance B – Maintenance C – Initial cost D – Durability E – Pollution free ORIGINAL LAYOUT JUDICIAL PHASE A-3A/CA/DA-2 C-2B/DE-2 D-3C-2 D-3 3. MAJOR PREFERENCE 2. MEDIUM PREFERENCE 1. MINOR PREFERENCE RAW SCORE ASSIGNED WEIGHT 79 12 57 810 23

13 JUDICIAL PHASE HDPE/ CWI/ PPR CWI HDPE PPR UPVC & CPVC GPR 92 10 73 2 42276 2 3 3 3 4 1 5 3 4 3 2 1 2 4 1 3 3 3 3 3 4 3 3 3 3 3 73 83 102 86 98

14 PROPOSAL 1 UPVC and CPVC types of pipes are capable of fulfilling all the requirements and achieve desired objectives. DEVELOPMENT PHASE COST DATA PIPING (Supply Water) SR 9362.5 Savings in Initial Cost SR 15025.05 – 76 % FOR THE PROPOSED DESIGN

15 DEVELOPMENT PHASE PROPOSAL 2 – 2 OVERHEAD TANKS Original Design: 2 Overhead tanks made of concrete with steel structure are to be constructed on the roof of the villa. Proposed Design: 2 Overhead tanks made of PVC can be installed which will give better performance and costs very less. Discussion: Concrete tanks do not restrict heat and it takes more time to construct, whereas PVC tanks are readymade, weather proof and takes very less time to install.

16 PROPOSAL 2 – 2 OVERHEAD TANKS DEVELOPMENT PHASE ORIGINAL DESIGN COST SR 27500 PROPOSED DESIGN COST SR 16250 SAVING SR 11250 41 %

17 LIFE CYCLE COST ANALYSIS FOR THE COMPLETE PROJECT DEVELOPMENT PHASE 20 YRS @ 10 % ORIGINAL DESIGN (HDPE, CWI & PPR) PROPOSED DESIGN (UPVC & CPVC) ALTERNATIVE 1 (GPR) INITIAL COST 12417568187.5110000 MAINTENANCE125680110 SALVAGE62107005675 LIFE CYCLE (PW) 12430073900110120

18 DEVELOPMENT PHASE IMPLEMENTATION PLAN 1.Approval from management 2.Change the purchase order and select the best supplier 3.Mechanical engineering services 4.It takes 3 months 5.Deadline as per the site handover schedule

19  The proposed design will  Supply water  Drain waste  Protect pollution  Provide durability  Prevent heat  Do large saving  Prevent maintenance costs  Save time  Improve appearance SUMMARY

20 THANK YOU