Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update.

Similar presentations


Presentation on theme: "Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update."— Presentation transcript:

1 Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update

2 Project Phasing 1 & 2: Demolish CEP, Pre-Moves, New Garage Entry/Exit Demolish Old CEP Temporary Entry/Exit at Waldemere Garage Central Receiving Complete – 1-Waldemere New CEP Completed Information Systems Complete – 5-Service Wound Care – 2-Waldemere Observation Complete – 9-East Surgery/CS Vertical Expansion On-Call – 4-Central Interim Moves for Surgery Support & Pathology Temporary ECC Turn-around & Canopy Temporary Main Entrance Canopy 2 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 2

3 Project Phasing 3 & 4: Temporary Drive, Complete Fall 2010 Temporary ECC Turn-around & Canopy Complete Wound Care – 2-Waldemere Surgery/CS Vertical Expansion Moves for Surgery Support & Pathology Complete Sitework & Temporary Drive Demolish Portion of Critical Care Tower 3 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 3 Temp Main Entry Turn-around & Canopy On-Call 3-East

4 Project Phasing 5: Demolish Northeast Wing and Main Entry, Begin Bridge Sitework & Temporary Drive Temp Main Entry Turn-around & Canopy ECC Vestibule, Canopy and Drop-off Complete Demolish Northeast Tower Main Entry Canopy Structure for Bridge, Elevator & Stair Surgery/CS Vertical Expansion 4 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 4

5 Project Phasing 6: Patient Tower Foundations, South Connector Complete Winter 2010 - 2011 Surgery/CS Vertical Expansion & Connector to So. Garage New Patient Tower Foundations Structure for Bridge, Elevator & Stair 5 Legend: Beige box is ongoing. 5

6 Project Phasing 7: Patient Tower Structure, Surgery / CS, Surgery/CS Vertical Expansion & Connector Complete New Patient Tower Structure 6 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 6