Renewable Energy Action Plan Martin Finucane DCENR
2
Renewable Directive Published in June 2009 Requirement for National renewable energy action plan Due by 30 June 2010
3
EU position Combined Climate Change and Energy Package Renewable energy target 20% of EU energy consumption from renewable sources Different targets for each Member State Ireland has target of 16%
4
Target Assessment Forecast Gross Final Energy Consumption from 2010 to 2020 Allow for Energy Efficiency measures Break into Electricity, Heating/Cooling and Transport Sectors Transport target minimum of 10% Flexibility mechanisms joint projects or statistical transfer
5
Current Position (1) Electricity - 2004 4.0 % of consumption - 2004 4.0 % of consumption 2009 14.4% of consumption 2009 14.4% of consumption 2010 target 15.0% of consumption 2010 target 15.0% of consumption 2020 target 40.0% of consumption 2020 target 40.0% of consumption
6
Current Position (2) Transport 2004 nil 2004 nil 2009 1.50% 2009 1.50% 2010 target 3.00% 2010 target 3.00% 2020 target 10.0% 2020 target 10.0%
7
Current Position (3) Heat 2004 3.6% of consumption 2004 3.6% of consumption 2009 3.9% of consumption 2009 3.9% of consumption 2010 target 5.0% of consumption 2010 target 5.0% of consumption 2020 target 12.0% of consumption 2020 target 12.0% of consumption
8
Contributions to targets 2009 Contributions to GFC RES-E2.7% RES-T0.6% RES-H1.5%
9
2020 Targets effect Electricity (40%) ~ 9% of energy Heat (12%) ~ 4% of energy Transport (10%) ~ 4% of energy
10
Template tables Table Number Data or List Content Table 2 List EU Targets from Directive Table 7,8 Data Biomass supply & Agri Land use. Table 5 List RE Policies & Measures Tables 10,11,12 Data Contribution of each technology type towards RES figure. Tables 4a, 4b Data RES (ktoe) by mode & Overall to 2020 Table 1 Data Projections of Energy Consumption Table 3 DataRES-H,T,E Table 6 Data Share of RE in Building Sector Table 9 Data Excess/Deficit of RES
11
Measures to achieve target Measure and Legal Reference Measure description and expected result Existing already or Planned Start and End Dates for each Scheme Regulatory, Financial or Information
12
Specific Measures required (1) Administrative Procedures and Spatial Planning Technical Specifications Buildings Information Provisions Installer Certifications Electricity Infrastructure Development
13
Specific Measures required (2) Electricity network operation Biogas integration District Heating and Cooling infrastructure Biofuels Sustainability criteria
14
Support Measures Electricity Support schemes Fiscal support Measures including investment and operational aidFiscal support Measures including investment and operational aid Regulatory Support MeasuresRegulatory Support Measures Description with legal reference, details of scheme, duration, past impact assessment and expected future results
15
Biomass Promotion Biomass availability – domestic and import Forestry resource assessment Agriculture resource assessment Waste resource assessment Agricultural land dedicated to energy production in 2007 Measures to increase Biomass Availability
16
Cooperation Measures Statistical Transfers between Member States Joint projects with Member States or third countries Joint support schemes Estimated excess/deficit renewable energy compared to indicative trajectory
17
Plan being drafted by Renewable Energy Division in conjunction with relevant State Bodies