Download presentation
Presentation is loading. Please wait.
Published byEugene Lockridge Modified over 9 years ago
1
ELAG 2001, PrahaMuseGlobal, Inc. The Information Connection Problem Dr Peter Noerr, CTO, MuseGlobal
2
ELAG 2001, PrahaMuseGlobal, Inc. Integration the Good the Bad the Ugly WWDTPAS (What We Did To Provide A Solution)
3
ELAG 2001, PrahaMuseGlobal, Inc. the Good One stop access One interface Consistency & Quality Reduced management & Cost Better resource use Post – processing (Extended Services) Faster development / install / use Leverage investment Personalise Systems control
4
ELAG 2001, PrahaMuseGlobal, Inc. the Bad Loss of identity Raised user expectations One size fits all Hidden technical failure Not enough information Too much information Security and Vulnerability Privacy
5
ELAG 2001, PrahaMuseGlobal, Inc. the Ugly(?) Non standard Standards Different standards not all there “parsons egg” Something old, Something new All Change Out of control I wrote it down somewhere…
6
ELAG 2001, PrahaMuseGlobal, Inc. And now for what we did A brief description of Muse Muse A demonstration
7
ELAG 2001, PrahaMuseGlobal, Inc. Contact: Dr Peter Noerr Chief Technology Officer MuseGlobal, Inc. peter.noerr@museglobal.com +1 801 426 8441 www.museglobal.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.