SEPTIC SYSTEM DESIGN
3
Ken Stratton
4
SUBSURFACE WASTEWATER TEAM
5
DAVID BRALEY (SUPERVISOR)
6
(1ST TIME VARIANCES-HIP REVIEWS)
JIM JACOBSEN (1ST TIME VARIANCES-HIP REVIEWS)
7
GLENN ANGELL (SITE EVALUATORS)
8
(LPI’S & REPLACEMENT VARIANCES)
BRENT LAWSON (LPI’S & REPLACEMENT VARIANCES)
9
THESE RULES ARE IN PLACE FOR
HEALTH AND SAFETY
10
TYPES OF SYSTEMS STONE DISPOSAL FIELD
11
INFILTRATOR - BIO-DIFFUSER
12
ENVIROSEPTIC TUBES - GEOFLOW
13
ELJEN GSF (IN-DRAINS)
14
CONCRETE CHAMBERS
16
90 GALLONS PER DAY / PER BEDROOM 594 square feet of disposal field
BASE DESIGN FLOW 2 BEDROOM HOUSE 90 GALLONS PER DAY / PER BEDROOM 2 x 90 180 gallons per day Soil profile is 3 = 3.3 sq. ft. per gallon 180 x 3.3 594 square feet of disposal field
17
594 square feet of disposal field
STONE TRENCH 20’ 2’ WIDE = 4 SQ. FT./ LINEAR FT. = 600 sq. ft. 594 / 4 = FEET OF TRENCH 3’ WIDE = 5 SQ. FT. / LINEAR FT. 594 / 5’= FEET OF TRENCH 2’ 3’ 30’ 119’ 149’ STONE DISPOSAL FIELD
18
PROPRIETARY DEVICES STONE FIELD = 20’ X 30’
INFILTRATOR CLUSTER = 36 SQ. FT. /UNIT TRENCH = 44 SQ. FT. / UNIT CLUSTER TRENCH 594 / 36 = 16.5 (17) units 594 / 44 = 13.5 (14) 3 ROWS OF 6 UNITS 1 56’ ROW 2 28’ROWS APPROX. 24’ X 11’ STONE FIELD = 20’ X 30’
19
TRENCH CONFIGURATION ONLY PIPE SPACING MIN. 1.5 FEET CENTER TO CENTER
PROPRIETARY DEVICES PRESBY TUBING TRENCH CONFIGURATION ONLY PIPE SPACING MIN. 1.5 FEET CENTER TO CENTER 5 SQ. FT. / LINEAR FOOT 40’ 60’ 594 / 5 = (119) LINEAR FEET 210 SQ. FT 2.5 FT SPACING 180 SQ. FT 4 FT SPACING STONE FIELD = 20’ X 30’
20
PROPRIETARY DEVICES STONE FIELD = 20’ X 30’
Eljen in-drains / GSF units TYPE A 594 / 24SQ. FT = (25 UNITS) TYPE B 594 / 48 SQ. FT = 12.3 (13 UNITS) STONE FIELD = 20’ X 30’
21
PROPRIETARY DEVICES Concrete Chambers STONE FIELD = 20’ X 30’ CLUSTER
4’ x 8’ = 64 SQ. FT / UNIT—9.2 (10 UNITS) 8’ X 8’ = 128 SQ. FT. / UNIT (5 UNITS) TRENCH 4’ X 8’ WITH 1’ OF STONE ALONG THE 4’ LENGTH = 77 SQ. FT./UNIT (8UNITS) 8’ X 8’ WITH 1’ OF STONE ALONG THE 8’ LENGTH = 90 SQ. FT /UNIT—6.6 (7 UNITS) STONE FIELD = 20’ X 30’
22
DISPOSAL FIELDS MUST BE LEVEL SATURATE ONE END OF THE DISPOSAL FIELD
DEFINITION OF LEVEL NOT TO EXCEED 2” IN 100 FEET STONE SCARIFICATION / TRANSITIONAL HORIZON SATURATE ONE END OF THE DISPOSAL FIELD MALFUNCTION
24
SYSTEMS AND SLOPES STONE FIELD
25
SYSTEMS AND SLOPES STONE FIELD
26
SYSTEMS AND SLOPES STONE FIELD
27
SYSTEMS AND SLOPES STEP DOWN
TOP VIEW
28
SYSTEMS AND SLOPES STEP DOWN
GSF UNITS TOP VIEW
29
MULTI – PORT DISTRIBUTION BOX
30
IF ITS NOT LEVEL, IT WONT WORK
HOW DOES THE DISTRIBUTION BOX FEED EVENLY TO EACH ROW IF ITS NOT LEVEL, IT WONT WORK
31
SYSTEMS AND SLOPES STEP DOWN
GSF UNITS PIPING IN SERIES PARALLEL TOP VIEW
32
What if the downslope fill extension cant catch up with itself?
33
If shorter distance is required, becomes a state variance
A man-made retaining wall, provided the retaining wall is no more than 24 inches in height and the horizontal distance from the outer edge of the fill shoulder to the retaining wall is at least 10 feet. If shorter distance is required, becomes a state variance 10’ 3’ 10’ prevent any under drain of the disposal field This provision applies only to soils with AIII, B, or C limiting factor conditions, located beneath and downslope of the disposal field
34
IF WORKING IN THE SZ, MUST BE CERTIFIED IN EROSION CONTROL
SHORELAND ZONE 100’ 75’ 250’ SHORELAND ZONE IF WORKING IN THE SZ, MUST BE CERTIFIED IN EROSION CONTROL THROUGH DEP
35
H20 LOAD RATING SYSTEMS AND SLOPES STEP DOWN Vehicular traffic:
Except where site limitations make it impractical, no driveway or parking or turning area may be located over any disposal field. When a system is placed under an area receiving vehicular traffic, H-20 loading components must be installed.
36
Original ground FILTER FABRIC Scarification Min. 4” Backfill Transitional Horizon and mix Min. 4” Cover Stone & Pipe
37
H20 LOAD RATING SYSTEMS AND SLOPES Vehicular traffic:
Except where site limitations make it impratical, no driveway or parking or turning area may be located over any disposal field. When a system is placed under an area receiving vehicular traffic, H-20 loading components must be installed. GSF systems shall not be installed under paved or concreted areas. Infiltrator Chamber H-20 load rating with 18” of cover. 12” fill under pavement and on top of 6” of system sand above tubes Fabric is added on top of the System Sand. All H-20 systems require venting.
38
H20 LOAD RATING INFILTRATORS 18” COVER BACKFILL PER SPECS
SCARIFICATION & TRANSITION HORIZON
39
H20 LOAD RATING 12” OF BACKFILL FILTER FABRIC 6” AROUND TUBES OF
SYSTEM SAND SCARIFICATION & TRANSITIONAL HORIZON
40
CONCRETE CHAMBERS
41
2 things that come up that effects the disposal systems that is actually a fixture on the internal plumbing
42
the use of septic tank outlet filters
Garbage disposal: Garbage disposals should not be used with disposal fields. However, if such units are proposed to be used, other measures must be taken, such as: increasing septic tank capacity by a minimum of 30 percent the installation of a second septic tank installed in series; or a multiple compartment septic tank the use of septic tank outlet filters must be included in the system design to prevent suspended solids from entering the disposal field
43
Water Filtration Devices
If known, amount of gallons backwashed should be added into the design
44
3 bed field 2 SEPERATE DWELLINGS 1 – 3 BEDROOM = 270 GPD 1000 1 - 1 BEDROOM (MIN DESIGN 2 BEDROOMS) 2 BEDROOMS = 180 GPD 3 bdrm 5 BEDROOMS + 1 bedroom garage
45
3 bed field 2 SEPERATE DWELLINGS 5 BEDROOMS 1000 TANK SIZE= 3 bdrm + 1 bedroom garage
46
1 dwelling = 3 bedrooms 1 dwelling = 2 bedrooms 5 bedrooms total
47
1 dwelling = 3 bedrooms 1 dwelling = 2 bedrooms 5 bedrooms total
1750 gal. 1 dwelling = 3 bedrooms 1 dwelling = 2 bedrooms 5 bedrooms total
48
3 bed field Expand by 2 bed 2 SEPERATE DWELLINGS 5 BEDROOMS 1000 TANK SIZE= 1750 gal. 3 bdrm 750 + 1 bedroom garage
49
3 bed field Expand by 2 bed 2 SEPERATE DWELLINGS 5 BEDROOMS 1000 TANK SIZE= 1750 gal. 3 bdrm 750 + 1 bedroom garage
50
3 bed field 1 UNIT = 4 BEDROOMS 2 SEPERATE DWELLINGS 5 BEDROOMS 1000 TANK SIZE= 1000 gal. 1750 gal. Shoreland zone = install expansion 3 bdrm Outside = record with Reg. of Deeds + 1 bedroom garage
51
MERRY CHRISTMAS