2 Significance of stormwater infrastructure rehabilitation Laboratory leaching testing – Objectives – Methods – Results Conclusions, Recommendations Overview

3 To Avoid Expensive Open Trench Techniques Trenchless Technologies are Being Used Open-trench repair: Traffic, Heavy Equip. Excavation, Inconvenience Installation, Cover Trenchless Technologies CIPP Polyurethane (PU) Polyurea (PEUU) PU/PEUU Blends Cement Mortar (CM) Polymer Enhanced CM (PECM) Stormwater Study

4 Polymer Enhanced Cement Mortar (PECM) Provides Structural Strength to Host Pipe Ingredients Calcium silicate cement, Crushed stone or gravel, Sand, Mineral clays, Fly ash, Crystalline silica Polymer type unspecified Crosslinked coating achieved when fully cured Cures in 24 hr Extreme temperature resistance High early and long-term strength Low porosity Possibly Water Quality Impacts? No Data for PECM

5 Polyurea Coatings Only Require Minutes for Complete Cure and are Reportedly Economical Coating cures within minutes Thin wall thickness Cold temperature curing ability Low cost because of ingredient versatility Possibly Water Quality Impacts? No Data for Polyurea

6 Specific Objectives: 1.Expose newly installed lining materials to synthetic water for 30 days 2.Document inorganic and organic contaminant levels in those contact waters 3.Analyze and interpret results Our Goal was to Characterize the potential that PECM and PEUU alter rinse water quality

7 Methods: A Static Leaching Procedure was Applied Synthetic Water Water pH 7.1 + 0.2 Alk. 42.5 + 3.1 mg/L as CaCO 3 3-day water changes, 22° C PEUU PECM Control 1 day InstallRemoval 10 days Testing Aquatic Significance TN, BOD 5 Inorganic pH, Alkalinity Organic TOC, COD, UV 254 Water Quality was Characterized

8 Results: Water pH was Significantly Affected by both PECM and PEUU Coatings PECM Control PEUU * Every 3 days old water was replaced

9 Water pH Changes can be Explained by Understanding Material Chemistry! 14=pH + pOH Diisocyanate ResinCarbamic Acid Functional Group Diamine

10 Results: PECM Increased Alkalinity due to the Addition of Hydroxide Ions PECM

11 PEUU Consistently Released Organics to the Water For 30 days while PECM Released Organics for Only 6 Days PEUU

12 COD Results Imply Organics Released from PEUU have an Oxygen Demand PEUU

13 BOD 5 Results Demonstrated that the Majority of Contaminants Released were Not Readily Consumed by Aerobic Organisms BOD 5 Raw Data Control 0 PEUU9.2 + 0.5 mg/L PECM0 Biodegradability Ratios RatiosWWTPPEUU 3-day COD/BOD 5 1.5 to 4.010.5 COD/TOC2.0 to 3.54.9

14 Total Nitrogen was Detected in PEUU Leachate Waters After the first Three Day Exposure Period 2.8 + 0.3 mg/L of Total Nitrogen Detected Average TN naturally occurring in rivers of Virginia is between 0.21 mg/L to 0.87 mg/L of TN US EPA (2000) Fate of Nitrogen Unknown Biodegradation (Nitrification) Chemical Transformation Recalcitrant

15 Based on Experimental Data Contaminant Concentrations Should Increase as Pipe Diameter Decreases Pipe Interior Diameter, inches Material and Contaminant Concentration, mg/L † PECMPEUU TOCAlkalinityCODTOCTN 3662170,9946,832462195 2486098,3009,640640270 121,577180,21717,3431,173495 † Results were calculated by applying experimentally data to a 10 foot long pipe where surface area and water volume calculations were completed.

16 Conclusions 1.PECM and PEUU altered water quality for 30 days 2.PECM raised the pH and alkalinity for 30 days and released TOC for 6 days 3.PEUU released organics for 30 days (COD and TOC) and nitrogen and BOD 5 for 3 days  Dynamic test procedure is needed  Document water quality impacts caused by different formulations, installation procedures  Cautious approach: Rinse coatings after installation and responsibly dispose of waters

17 Acknowledgement Ms. Laura Linn (Dauphin Island Sea Laboratory) Ms. Bridget Donaldson ( Virginia Department of Transportation) Ms. Eddy Colmenarez (University of South Alabama) Dr. Kevin White (University of South Alabama) Ms. Suzanne Lindblom (Mobile Area Water and Sewer System)

18 Dr. Andrew J. Whelton Department of Civil Engineering University of South Alabama ajwhelton@usouthal.edu Matthew Tabor Department of Civil Engineering University of South Alabama mlt1002@jagmail.southalabama.edu


Download ppt "Matt Tabor, Maryam Salehi, Ph. D., Jesus Estaba, Andrew J. Whelton, Ph.D. Department of Civil Engineering University of South Alabama August 6, 2012 Influence."

Similar presentations


Ads by Google