Download presentation
Presentation is loading. Please wait.
Published byKenny Griff Modified over 10 years ago
1
1 Answer the questions relating to each of the graphics in turn. Say the answer to yourself, then check it. To revise the passive, click HERE Self-testing Structures Practice - Passive Forms (advanced) To revise motorway vocab, click HERE Motorway Construction
2
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 2 What about the motorway route? It’s being cleared (prepared). START AGAIN Graphic 1
3
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 3 What about the third tree from the top left? It’s being cut (sawn) down. Graphic 1 START AGAIN
4
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 4 How many trees have been cut down so far? Four of them have been cut down so far. Graphic 1 START AGAIN
5
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 5 What is the bulldozer being used for? It’s being used to tow/drag/take away the trees which have been cut down. Graphic 1 START AGAIN
6
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 6 What about the tree in the bottom centre of the graphic? It’s being towed/dragged/taken away. Graphic 1 START AGAIN
7
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 7 Where do you think it is being taken? It’s being taken to a sawmill. Graphic 1 START AGAIN
8
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 8 What is going to happen to it? It’s going to be cut (sawn) up into logs and planks. Graphic 1 START AGAIN
9
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 9 How many trees are going to be left standing? Two trees are going to be left (standing). Graphic 1 ?
10
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 10 Who are the two men with instruments? They’re surveyors. Graphic 1 START AGAIN
11
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 11 What are their instruments being used for? They’re being used to survey the route. Graphic 1 START AGAIN
12
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 12 What has been dug? A trench has been dug. Graphic 2 START AGAIN
13
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 13 What has been laid in the trench? (Drainage) Pipes have been laid in it. Graphic 2
14
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 14 Why hasn’t the trench been filled in yet? Because the pipes haven’t been connected (yet). Graphic 2 START AGAIN
15
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 15 What is going to happen once the pipes have been connected? The trench is going to be filled in. Graphic 2 START AGAIN
16
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 16 What is the bulldozer going to be used for once the pipes have been connected? It’s going to be used to fill in the trench. Graphic 2 START AGAIN
17
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 17 What do you you think will be done with any surplus earth once the trench has been filled in? It will be taken away. Graphic 2 START AGAIN
18
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 18 How many trees are being cut down? There are no trees being cut down. No trees are being cut down Graphic 2 START AGAIN
19
Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 19 How many trees have been left (standing)? Two trees have been left (standing). Graphic 2 START AGAIN
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.