HEIS INSTALLATION PROCESS 1
2
DEMARCATION IN FIELD 2
3
POND CONSTRUCTION 3
4
CONSTRUCTION OF PLATE FORM 4
5
ERECTION OF HEAD UNIT 5
6
HEAD UNIT 6
7
7
8
SHADE OVER HEAD UNIT 8
9
INSTALLATION OF FERTIGATION PUMP 9
10
PIPE LAYING 10
11
PIPES JOINING 11
12
PIPE LAID IN TRENCH 12
13
INSTALLATION OF VALVES 13
14
DRILLING FOR GROMETS 14
15
HOLES MADE WITH DRILL 15
16
PLACING GROMETS 16
17
COVERING HOLES 17
18
PUTTING TAKEOFF 18
19
LATERAL JOINING WITH TAKEOFF 19
20
LATERAL LAYING 20
21
END STOP 21
22
LATERALS LAID IN FIELD 22
23
PUNCHING OF LATERAL 23
24
INSTALLATION OF ONLINE DRIPPERS 24
25
INSTALLED DRIPPER 25
26
PRESSURE CHECK 26
27
FARMER TRAINING 27
28
FARMER TRAINING 28