Toe Wall and Water channels for erosion control
2
Toe Wall and Garland drains for erosion control
3
Cribbs on the slopes to stabilise the Bio mass
4
Plantation on OB dumps after re-grading of slopes
5
Biological engineering results
6
2nd October 2003 SLOPES TREATMENT
7
Treated Dump Slope at BPA OC-II Extn.
8
Stabilized OB Dump as a Result of Bio-engineering
9
Excavation, Green belt and Reclamation taken up Concurrently in an Opencast mine
10
Raising of saplings at SCCL Nursery
11
Rehabilitation of OB –Oct. 24 th 2002-OC-I-GDK
12
Stabilized OB as on 21 st Dec.2003-Result of Bio-engineering
14
One Year Amla –result of nutrients addition – GK.OC
15
Plantation in colonies
17
Intensive treatment for better slope stabilisation
18
GK-OC as during January 2005 –Vetiveria for arresting soil erosion and soil run off
19
GK-OC as during October 2005 –Amla (15 months old).
20
Garland drain along the boundary
21
Continuous Cattle Proof Trench
22
Bio-diversity conservation BamboosetumCycas Medicinal plantsAquatic habitat development
24
Bamboo Plantation in front of RK5B Inc.
27
Bamboosetum
28
Palmatum About 35 varieties of palms planted at one place as a germ plasm bank and rare site to see large no.of palms at one site.
29
Endemic species conservation The species that are unique to Chitoor and Cuddapah district in the world are planted in large numbers in SCCL area
30
Nava graha Vanam
31
Aquatic habitat development
32
Converting waste into visual treat
33
Creating aesthetic, clean &green working and living environment Green lungs Coal handling plant Avenue plantation Nature park Nursery
34
Block Plantation at Srirampur Area