TPC Very High Voltage Control Status report Marco Boccioli 20/04/2006
2
Summary PLC control and communication routines implemented and tested PVSS interface implemented Safety features tested System being installed at P2 Draft technical note: \\pcaitdc21\share\TPC \\pcaitdc21\share\TPC
3
Implementation: devices
4
Implementation: State Diagram
5
Implementation
6
PVSS user interface
7
Safety ErrorReactionReaction time [s] Any interlock is badSoftware ramp downInterlock dependent Voltage tripSoftware ramp down<4 ELMB is not activeHardware ramp down<7 RS232 communicationHardware ramp down<14 Current tripHardware ramp down<1 HV Output is offHardware ramp down<15 Enable Set Value is offHardware ramp down<1 PLC not runningHardware ramp down<1 Electrical safety checked PLC safety routines tested
8
Installing the system
9
PVSS with FSM Schneider OPC server Supervisory
10
Installing the system Schneider Electric Premium P57 5634M PLC
11
Installing the system Heinzinger PNC 150000 Power Supply
12
Installing the system ELMB One for each side
13
Installing the system Cabling Seven points for each side
14
What next… End the cabling Test the installed system Integrate the FSM with DCS Release the technical note (\\pcaitdc21\share\TPC)\\pcaitdc21\share\TPC