Download presentation
Presentation is loading. Please wait.
Published byAubrey Rannells Modified over 9 years ago
1
WELCOME! October 28, 2013 ODOT District 1 & District 2
2
www.transporta6 ion.ohio.gov 2 October 28, 2013 PURPOSE OF TODAY’S MEETING Provide a project overview Provide a project overview Present Update for HAN-224-11.81 Present Update for HAN-224-11.81 Present MOT for HAN-75-14.39 & Proposed Roundabouts on Lima Ave. Present MOT for HAN-75-14.39 & Proposed Roundabouts on Lima Ave. Present D2 update on I-75 north of Findlay Present D2 update on I-75 north of Findlay Listen to your input Listen to your input
3
www.transporta6 ion.ohio.gov 3 October 28, 2013 HAN-224-11.81 $11.5 Million funded with Turnpike Funding Independent project 2014 construction IR-75/US-224 interchange status:
4
www.transporta6 ion.ohio.gov 4 October 28, 2013 PROJECT OVERVIEW – HAN-224-11.81 Reconstruct of I-75 interchange with USR 224 Reconstruct of I-75 interchange with USR 224 Reconstruction and widen of bridge Reconstruction and widen of bridge Adding lanes Adding lanes Turn Lanes on and off bridge Turn Lanes on and off bridge Replacing existing signals Replacing existing signals
5
www.transporta6 ion.ohio.gov 5 October 28, 2013 MAINTENANCE OF TRAFFIC HAN-224-11.81 Part-width construction Part-width construction One lane in each direction One lane in each direction Closures/Detours: Closures/Detours: Short duration closures of ramps and USR 224 Short duration closures of ramps and USR 224 Short term use of ramps to maintain I-75 traffic Short term use of ramps to maintain I-75 traffic
6
www.transporta6 ion.ohio.gov 6 October 28, 2013 PROJECT OVERVIEW – HAN-75-14.39
7
www.transporta6 ion.ohio.gov 7 October 28, 2013 PROJECT OVERVIEW – HAN-75-14.39 Construction scheduled for 2017 but could begin as early as 2015 Construction scheduled for 2017 but could begin as early as 2015 Reconstruct & widen I-75 to 6 lanes Reconstruct & widen I-75 to 6 lanes New Right-of-Way Required New Right-of-Way Required Began to purchase R/W Feb. 2013 Began to purchase R/W Feb. 2013 Current Estimated Construction Cost: $150 Million Current Estimated Construction Cost: $150 Million
8
www.transporta6 ion.ohio.gov 8 October 28, 2013 PROJECT OVERVIEW – HAN-75-14.39 Harrison St overpass reconstructed Harrison St overpass reconstructed Lima Ave interchange reconstructed with US68/SR15/IR75 interchange Lima Ave interchange reconstructed with US68/SR15/IR75 interchange New Service Rd near ODNR New Service Rd near ODNR Roundabouts on Lima Ave at ramps Roundabouts on Lima Ave at ramps
9
www.transporta6 ion.ohio.gov 9 October 28, 2013 PROJECT OVERVIEW – HAN-75-14.39 The following overpasses will not be replaced as part of this project: The following overpasses will not be replaced as part of this project: CR 88 – Sandusky Street CR 88 – Sandusky Street SR 12 – Main Cross Street SR 12 – Main Cross Street US 224 – Construction 2014 US 224 – Construction 2014 CR 95 – Bigelow Avenue CR 95 – Bigelow Avenue CR 99 CR 99
10
www.transporta6 ion.ohio.gov 10 October 28, 2013 MAINTENANCE OF TRAFFIC HAN-75-14.39 MOT is preliminary at this time MOT is preliminary at this time Project separated into Four Zones Project separated into Four Zones 3 MOT Methods 3 MOT Methods Maintaining 2 lanes each direction on I-75 and 1 lane each direction on US68/SR15 Maintaining 2 lanes each direction on I-75 and 1 lane each direction on US68/SR15 Hybrid Method – System to System Interchange Hybrid Method – System to System Interchange
11
www.transporta6 ion.ohio.gov 11 October 28, 2013 MAINTENANCE OF TRAFFIC HAN-75-14.39 – MOT ZONES
12
www.transporta6 ion.ohio.gov 12 October 28, 2013 MOT - TYPICAL SECTIONS (ZONE 3 – PART-WIDTH)
13
www.transporta6 ion.ohio.gov 13 October 28, 2013 HAN-75-14.39 – HYBRID MOT
14
www.transporta6 ion.ohio.gov 14 October 28, 2013 I-75 NORTH TO US68/SR15 & LIMA AVE
15
www.transporta6 ion.ohio.gov 15 October 28, 2013 I-75 SOUTH TO US68/SR15 & LIMA AVE
16
www.transporta6 ion.ohio.gov 16 October 28, 2013 US68/SR15 & LIMA AVE TO I-75 NORTH
17
www.transporta6 ion.ohio.gov 17 October 28, 2013 US68/SR15 & LIMA AVE TO I-75 SOUTH
18
www.transporta6 ion.ohio.gov 18 October 28, 2013 LIMA AVE TO & FROM US68/SR15
19
www.transporta6 ion.ohio.gov 19 October 28, 2013 LIMA AVE TO & FROM US68/SR15
20
www.transporta6 ion.ohio.gov 20 October 28, 2013 I-75 AREA NORTH OF US68/SR15
21
www.transporta6 ion.ohio.gov 21 October 28, 2013 LIMA AVE - ROUNDABOUTS
22
www.transporta6 ion.ohio.gov 22 October 28, 2013 I-75 NORTH OF FINDLAY Multiple projects funded with turnpike revenue Multiple projects funded with turnpike revenue Reconstruction & widen of I-75 from two to three lanes in each direction Reconstruction & widen of I-75 from two to three lanes in each direction From County Road 99 in Hancock County to I-475 in Wood County From County Road 99 in Hancock County to I-475 in Wood County Distance of 31.6 Miles Distance of 31.6 Miles Estimated Total Cost: $220 Million Estimated Total Cost: $220 Million
23
www.transporta6 ion.ohio.gov 23 October 28, 2013 I-75 NORTH OF FINDLAY
24
www.transporta6 ion.ohio.gov 24 October 28, 2013 I-75 NORTH OF FINDLAY Widening will take place in the existing median Widening will take place in the existing median Median width 84’ for the north 2/3 of the project length and 50’ - 60’ for south 1/3 of the project Median width 84’ for the north 2/3 of the project length and 50’ - 60’ for south 1/3 of the project Cable barrier north of Cygnet Road, concrete barrier south of Cygnet Road Cable barrier north of Cygnet Road, concrete barrier south of Cygnet Road Two lanes of traffic will be maintained throughout the duration of the project Two lanes of traffic will be maintained throughout the duration of the project
25
www.transporta6 ion.ohio.gov 25 October 28, 2013 I-75 NORTH OF FINDLAY: North Baltimore CR 95 to Oil Center Rd. Design Build Project Estimated Cost: $55M
26
www.transporta6 ion.ohio.gov 26 October 28, 2013 I-75 NORTH OF FINDLAY: Oil Center Rd. to Portage Rd. Estimated Cost: $50M
27
www.transporta6 ion.ohio.gov 27 October 28, 2013 I-75 NORTH OF FINDLAY: Bowling Green Portage Rd. to Portage Rd. to Devil’s Hole Rd. Devil’s Hole Rd. Estimated Cost: Estimated Cost: $55M $55M
28
www.transporta6 ion.ohio.gov 28 October 28, 2013 I-75 NORTH OF FINDLAY: Bowling Green – US 6 & I-75 ABC
29
www.transporta6 ion.ohio.gov 29 October 28, 2013 I-75 NORTH OF FINDLAY: Bowling Green Devil’s Hole Rd. to I-475 to I-475 Estimated Cost: $60M $60M
30
www.transporta6 ion.ohio.gov 30 October 28, 2013 I-75 NORTH OF FINDLAY: Construction: Start 2014 Construction complete: 2016 I-75 North of Findlay District 2 Contacts: –Aaron Behrman, ODOT District 2, Design Engineer Phone No.: (419) 373-4402Phone No.: (419) 373-4402 –Mike Stormer, ODOT District 2, Planning Engineer Phone No.: (419) 373-4472Phone No.: (419) 373-4472
31
www.transporta6 ion.ohio.gov 31 October 28, 2013
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.