Download presentation
Presentation is loading. Please wait.
Published byBraulio Duck Modified over 9 years ago
1
Current meters Tide gauges Figure 1
2
Current speeds incoming tide spring tide July 06 60 cm/s 85 cm/s 20 cm/s Figure 2
3
Current speeds outgoing tide spring tide July 06 40 cm/s 60 cm/s 15 cm/s Figure 3
4
Current speeds neap tides July 06 25 cm/s 35 cm/s 8 cm/s Figure 4
5
Peak current speeds during river flood 3 Aug 06 Always outgoing 105 cm/s 75 cm/s Figure 5
6
Average current speeds during river flood 3 Aug 06 Always outgoing 75 cm/s 50 cm/s Figure 6
7
Figure 7 1942
8
Figure 8 1961
9
Figure 9 1975
10
Figure 10 1978
11
Figure 11 1985
12
Figure 12 1987
13
22 July 1994 Figure 13
14
10 December 1996 after Nov 1996 floods Figure 14
15
10 October 1997 Figure 15
16
Jan 1999 Figure 16
17
5 September 2000 Figure 17
18
28 March 2001 Figure 18
19
10 October 2002 Figure 19
20
2003 Figure 20
21
27 June 2003 Figure 21
22
6 March 2006 Figure 22
23
26 July 2006 Figure 23
24
6 October 2006 Figure 24
25
estuary flow marina through flow marina local flow Flood tide Ski Canal closed Sea Glades closed This was the situation from ~ 1985 to mid-2002 before Sea Glades Bridge was constructed Figure 25
26
Flood tide Ski Canal open Sea Glades closed estuary flow marina through flow marina local flow This was the situation from mid-2002 (when Ski Canal opened due to a large southward migration of the estuary inlet) till 27 October 2003 when Sea Glades Bridge was opened Figure 26
27
Flood tide Ski canal open Sea glades open estuary flow marina through flow marina local flow This was the situation from 27 October 2003 (when Sea Glades Bridge was opened) to the present Figure 27
28
estuary flow marina through flow marina local flow Flood tide Ski Canal closed Sea Glades open This would be the situation if Ski Canal closes again Figure 28
29
Sand banks in the marina as at 10 June 2006 Upstream of Sea Glades Bridge Figure 29
30
10 June 2006 Downstream of Sea Glades Bridge Figure 30
31
10 June 2006 Upstream of Shore Rd Bridge Figure 31
32
10 June 2006 Around Bird Island Figure 32
33
10 June 2006 Ski Canal and downstream of Bird Island Figure 33
34
10 June 2006 Cove Canal Figure 34
35
10 June 2006 Cove Canal Figure 35
36
10 June 2006 Cove Canal Figure 36
37
Effect of tsunami at Port Elizabeth harbour Figure 37
38
Bird Island 27 June 2003 before Tsunami Figure 38
39
Bird Island 6 March 2006 after Tsunami Figure 39
40
Sea Glades Bridge 27 June 2003 before Tsunami; Sea Glades Bridge was opened 27 October 2003 Figure 40
41
Sea Glades Bridge 6 March 2006 after Tsunami; Sea Glades Bridge was opened 27 October 2003 Figure 41
42
Tsunami on Sri Lanka coast strong backwash carries sediment seaward Figure 42
43
Tsunami on Sri Lanka coast strong backwash carries sediment seaward Figure 43
44
Maintenance dredging of canal to reduce current speed Trim corner even more to reduce turbulence. Erf 1467 Maintenance dredging of canal to reduce current speed Armour banks where water currents are causing erosion 6 March 2006 Widen canal: trim Erf 1473 Maintenance dredging of canal to reduce current speed Trim corner to reduce turbulence Erf 1470 Figure 44 Erf 2845 Erf 1468 Erf 1363 Erf 1362 Erf 1474
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.