Presentation is loading. Please wait.

Presentation is loading. Please wait.

Team Klickitat Persistence of Vision Globe Team Members Maldeep Kang Chris Scott Rose Harber Michael Burton Faculty Advisor Dr. Peter Osterberg Industry.

Similar presentations


Presentation on theme: "Team Klickitat Persistence of Vision Globe Team Members Maldeep Kang Chris Scott Rose Harber Michael Burton Faculty Advisor Dr. Peter Osterberg Industry."— Presentation transcript:

1 Team Klickitat Persistence of Vision Globe Team Members Maldeep Kang Chris Scott Rose Harber Michael Burton Faculty Advisor Dr. Peter Osterberg Industry Representative Zubin Bagai, BPA & IEEE Client Sam and Emmi Leach

2  Team Introductions  Project Overview  Milestones  Accomplishments  Demonstrations  Issues/Concerns  Conclusion Agenda

3  Michael Burton  Microcontroller and Programming Lead  Parts Supply Logistics  Maldeep Kang  Web Development Lead  Macro Model Assembly  Chris Scott  Spring Team Lead  Motor, Base & Spinning Platter  Rose Harber  Fall Team Lead  LED Ring and Platter Wiring/Debug Team Klickitat

4  Persistence of Vision Globe  Stroboscopic Effect  Sense  Process  Display  Inspired by LED Cube  Create aesthetically pleasing apparatus Project Overview

5 Block Diagram

6 Project Overview

7 StatusDescriptionCompletion Date CompleteProject Proposal30 Aug 2013 CompleteFunctional Specification v0.920 Sep 2013 CompleteWebsite Launched26 Sep 2013 Complete Functional Specification v0.95 27 Sep 2013 CompleteFunctional Specification v1.0 Approval04 Oct 2013 CompleteInitial MOSIS EDF File completion31 Oct 2013 CompleteDesign Document v0.901 Nov 2013 CompleteDesign Document v0.9508 Nov 2013 CompleteDesign Document v1.015 Nov 2013 CompleteFinal Budget15 Nov 2013 CompleteMOSIS EDF File Completion15 Nov 2013 CompleteInitial Microcontroller Programming Completion31 Jan 2014 In ProgressMacro Model Completion15 Feb 2014 In ProgressMacro Model Debugged6 Mar 2014 In ProgressMOSIS Chips Received13 Mar 2014 In ProgressDebug with MOSIS Chips Completion21 Mar 2014 In ProgressFinal Report v0.921 Mar 2014 In ProgressFinal Report v0.9528 Mar 2014 In ProgressFinal Reportv1.04 Apr 2014 In ProgressFounder’s Day Presentation8 Apr 2014 In ProgressPost Mortem Presentation17 Apr 2014 Milestones

8 Accomplishments MOSIS Chip B2 Logic Layout

9 MOSIS Chip Layout

10 GUI Program in Excel Microcontroller Programming

11 Macro Model Assembly

12 Circuitry Platter with MOSIS Layout

13 Mechanical Assembly

14 User interface. LED array on the bread board macro model. Spinning assembly. Demonstrations

15  Balancing the spinning assembly.  Debugging code for the microcontroller.  Wire wrapping for the MOSIS chips. Issues/Concerns

16  Experimentation will lead to correct functionality.  Project is on Schedule.  Next:  Complete construction of base, ring and platter.  Wire-wrap the circuitry platter for MOSIS.  Continue debugging code. Conclusion

17  Chris Scott (Motor/Base/Circuitry Platter, Spring Semester Team Lead)  scott14@up.edu scott14@up.edu  Rose Harber (LED Ring, Circuitry Platter, Fall Semester Team Lead)  harber14@up.edu harber14@up.edu  Maldeep Kang (Website Developer, Macro Model)  kang14@up.edu kang14@up.edu  Michael Burton (MOSIS, Microcontroller)  burton15@up.edu burton15@up.edu Questions


Download ppt "Team Klickitat Persistence of Vision Globe Team Members Maldeep Kang Chris Scott Rose Harber Michael Burton Faculty Advisor Dr. Peter Osterberg Industry."

Similar presentations


Ads by Google