EDSGN 100 Hydrogen Fuel City Group 5 Stephen Ulisny, Neil Arias, Curtis Covelli, Sebastian Reigber
2
Design Task Background Specs Production Transportation Source of Power Storage Best Solution Flow Chart Prototype Cost Analysis Conclusion Questions
3
Standardized fueling station for a H2 city Supply the transportation network with H2 fuel using renewable resources
4
Boulder City, Nevada–25 miles SE of Las Vegas Located about 6 miles from the Hoover Dam and 5 miles from the Boulder City Landfill Population: 16,840 Requires about 9,000kg of H2 a day to meet transport needs
5
Safe Sustainable 350 BAR and 700 BAR for passenger and commercial vehicles. HCNG containing up to 30% hydrogen at 250 BAR 2 stations to meet the city needs with 6 pumps at each station
6
Electrolysis ◦ Water Large energy cost ◦ Urine Urine breaks down ◦ Microbial Not developed Molten Carbonate Fuel Cell Breaks Down Steam Biomethane Costly
7
Trucks Constant Refill Pipes Costly Produced on Site Need of space Produced at House Not realistic
8
Liquid Expensive Gas Storage Produced Right Before Use Cant keep up with demand
9
Solar Lack of Space Wind Lack of Space Coal Not Renewable Nuclear Expensive Hydroelectric Not Enough Power Methane Waste Abundance of CH4
10
Production ◦ Steam Methane Reforming Transportation ◦ Trucks-H2 ◦ Piping-CH4 Storage ◦ Liquid Source of Power ◦ Methane
11
STEAM METHANE REFORMER CO2 CH4 STEAM H2 WATER Boulder City Landfill Boulder City Landfill CH4 PUMPING STATION PUMPING STATION H2 Liquefier H2 Liquefier LIQUID H2 TRUCKING BOILER FUEL
12
350 BAR H2 STORAGE 700BAR COMPRESSOR PUMP CNG COMPRESSOR BC Landfill CNG STORAGE CH4 LIQUID H2 STORAGE LIQUID H2 STORAGE TRUCKED H2 VAPORISER HCNG BLENDER H2 GAS COOLING BLOCK CHILLER
14
Steam Methane Reformer -> $20,000,000 + Pipelines -> $10,000,000 + Cost of Stations -> $17,324,000 Total Cost of System -> $57,324,000
15
Sell 350 and 700 bar at 4$ a kg ->$30,400 per day Sell HCNG at 5$ a kg -> $37,500 per day Cost to pump -> $40,000 per day 50 employees to run system -> $7,000 per day Nitrogen -> $5,000 per day Methane -> $2,000 per day Total Profit -> $13,900 per day Yearly Profit -> $5,073,500 a year
16
The system will be paid off in a little over 11 years This system is replica table around most cities that have landfills in the vicinity We could sell hydrogen for other city needs
18
Nevada Picture: ◦ http://www.flickr.com/photos/travelnevada/303826766 7/ http://www.flickr.com/photos/travelnevada/303826766 7/ ◦ http://www.ecosalon.com/wp- content/uploads/2010/01/Apex-Nevada.jpg http://www.ecosalon.com/wp- content/uploads/2010/01/Apex-Nevada.jpg ◦ http://www.trucktanks.com/img/fuel/ft010-01.jpg http://www.trucktanks.com/img/fuel/ft010-01.jpg Information ◦ http://www.airproducts.com/Products/fastfacts/charts.h tm http://www.airproducts.com/Products/fastfacts/charts.h tm ◦ http://www.getenergysmart.org/files/hydrogeneducatio n/6hydrogenproductionsteammethanereforming.pdf http://www.getenergysmart.org/files/hydrogeneducatio n/6hydrogenproductionsteammethanereforming.pdf