Rolling Chassis Team Todd Anderson Matt Blackwood David Hovater Josh Smith Jessica Yoho
2
Overview Formula SAE at a Glance Project Summary Frame Suspension Brakes Steering Seat Uprights Building Parts Lathe Mill Large Band Saw Small Band Saw Composites Important Dates
3
Formula SAE Competition One of the largest Collegiate competitions Design, build, and compete with small Formula style cars 140 Universities from around the world compete in static and dynamic events Increase awareness for The University of Alabama Covers many aspects of Engineering Competition Date: 5/18/2005 – 5/22/2005
4
Formula SAE 0-60 in under 4 seconds Can corner up to 1.5 g’s Weighs around 500lbs 70 Hp Engine
5
Project Statement Design, build, and test a rolling chassis for integration with the 2005 UA Formula SAE car design.
6
2005 Car at a Glance
7
66” Wheelbase 48/46” Front Rear Track Seating Position under the Main Roll Hoop Two Pedals Pull Rod Suspension Semi Stressed Engine
8
Frame at a Glance
9
Frame Objectives Reduce Weight Less than 60lbs total weight for the Frame Use of Thinner Tubing Increased Driver Room Increase Torsional Resistance Reduce Complexity Integrate Subsystems into Frame Use of Square Tubing Partially Stressed Engine Easier to Build 4130 Spaceframe
10
Frame Analysis (Front) FEA Analysis in ANSYS Max Deflection: <0.08in Max Stress <31ksi
11
Suspension at a Glance Double A-arms Low Roll Center Pull Rod Vanilla RC Bicycle Shocks Anti-Sway Bar Use of Spherical Bearings
12
A-arm Attachment to Frame Shims 1/4” bolt Aluminum Bracket Spherical bearing & housing A-arm Front View
13
Spherical Bearings Mis-Alignment Angle of 24º Will Be in Housing held in place by a snap ring
14
Front A-arms Analysis FEA ANSYS Results Loaded to Simulate Braking and Cornering Max Deflection <0.05” Max Stress <22ksi
15
Brakes At a Glance 3 Disc Setup 2 Outboard Brakes in Front 1 Inboard in Rear 9” Diameter Rotors Dual Piston Calipers Left Foot Brake setup (Only two Pedals) Balancing Bar
16
Brakes Wilwood PS-1 Calipers Dual 1.12 inch pistons 9”Custom Rotors Dual master cylinders Balancing bar used to adjust bias PS-1 Caliper Dual MC Balance bar
17
Steering Located under Driver’s legs Ackerman Geometry 12 ft Turning Radius Minimal Bump Steer Two Universal Joints to Route Steering Linkage
18
Steering Rack Track Travel: 3” Weighs 1.96 lbs Rack Length is 8.5” 1.125 Turns Lock to Lock Jr. Dragster Steering Rack From Chassis Shop
19
Seat at a Glance Carbon Kevlar Composite Reclined 30º from the Vertical Legs Elevated 4” Lateral Support
20
Front Uprights
21
Front Upright Brake Caliper Bracket moved to integrate into Steering Attachment Steel Construction opposed to Aluminum Similar Weight Reduced Cost Easier to Make Endurance Rotor Mount integrated into Wheel Studs Smaller Spindle and Inboard Bearing to take Advantage of Strength of Steel
22
Front Upright FEA Analysis ANSYS Max Deflection <0.003” Max Stress < 16ksi Weighs Approximately 2.75lb with Axle and Brake Bracket
23
Rear Uprights at a Glance Aluminum 6061-T6 CNC Design Minimal Deflection Lightweight Taylor Racing Stub Axle
24
Rear Uprights Overall Dimensions Constraints / Loading Conditions Maximum Deflection is 0.002” Maximum Stress is 3500 psi
25
Stub Axle Stub Axle Assembly will be changed to same model used in 2004 Car More Expensive but can be covered with new Funds Much Stronger, more Proven, and Lighter Manufactured by Taylor Racing
26
Building Plans Construction of Rolling Chassis needs to be completed by December 16 th 489 Currently occupying Projects Building Starting November 11 th 1-4pm Weekday Afternoons Wednesday November 24 th – All day
27
Lathe Spindle Housings for Spherical Bearings Engine Mounts
28
Mill Frame Members Pieces for Jig Table Assembly Jig for Front Upright A-arms Brake Rotor
29
Large Band Saw Frame Members Front Upright Pieces A-arms
30
Small Band Saw A-arm Attachments Front Upright
31
TIG Welder Frame Frame Jig Table Front Uprights A-arms A-arm mounts to Frame
32
Other Bench Grinder A-arm Attachments Front Upright Chop Saw Frame Members
33
Composite After Step 1: Sand seat to proper dimensions Step 2: Apply Bondo to the entire seat Let seat dry for 24 hours Step 3: Sand down seat to a smooth finish with fine grit sandpaper Step 4: Cut several sheets of Carbon Kevlar fabric to the specified dimensions. Step 5: Lay one sheet of fabric vertically on the seat mold and apply resin. Allow to dry. Step 6: Lay another sheet of fabric horizontally on the seat mold and apply resin. Allow to dry. Repeat as needed. Step 7: Discard foam mold. Before
34
Important Dates November: 7 th Last Autocross of the year in Birmingham 17 th Engine Mounted to Dyno 24 th Drivetrain Coupling Completed Composite Process Build Date in Projects Building December: 4 th Stock Engine Running 16 th Rolling Chassis Completed January: 21 st Running Engine With Restrictor Pedal Construction March: 18 th Driving
35
Questions?