Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 V1.00 © 2009 ZelFlex QR Quick Released double-sided mechanical stretching frame Step by step User guide.

Similar presentations


Presentation on theme: "1 V1.00 © 2009 ZelFlex QR Quick Released double-sided mechanical stretching frame Step by step User guide."— Presentation transcript:

1 1 V1.00 © 2009 ZelFlex QR Quick Released double-sided mechanical stretching frame Step by step User guide

2 2 Assembly of protect frame Frame without stencil ZelFlex QR V1.00 © 2009

3 3 Assembly of protect frame Using the two hexagon- headed screws, attach the rear bar according to the stencil length. Tighten them. Rear bar must be parallel to the rear frame profile. ZelFlex QR V1.00 © 2009

4 4 Assembly of protect frame Unwind the nuts from the stretching screws by about 10 mm. ZelFlex QR V1.00 © 2009

5 5 Assembly of protect frame Remove the holding bars from the rear clamping and front stretching bars. ZelFlex QR V1.00 © 2009

6 6 Remove the holding bars in 3 steps : Step 1 – Press the holding bar down Step 2 - Move the holding bar to the right direction Step 3 – Remove the holding bar ZelFlex QR V1.00 © 2009

7 7 Assembly of protect frame Remove holdings bars and place them in front of and behind the frame. ZelFlex QR V1.00 © 2009

8 8 Place the stencil to the pins on the rear clamping bar. ZelFlex QR V1.00 © 2009

9 9 Assembly of protect frame Close the rear clamping bar with the rear holding bar. ZelFlex QR V1.00 © 2009

10 10 Close the rear holding bar in 3 steps : Step 1 – Place the holding bar to the rear clamping bar Step 2 - Press down the holding bar and move it to the left. Step 3 - Release the holding bar. ZelFlex QR V1.00 © 2009

11 11 Place the stencil to the pins on the front stretching bar. ZelFlex QR V1.00 © 2009

12 12 Assembly of protect frame Close the front stretching bar with the front holding bar. ZelFlex QR V1.00 © 2009

13 13 Close the front stretching bar in 3 steps : Step 1 – Place the holding bar to the front stretching bar Step 2 - Press down the holding bar and move it to the left. Step 3 - Release the holding bar. ZelFlex QR V1.00 © 2009

14 14 Assembly of protect frame Tighten the stretching screw to get correct tension of the stencil. ZelFlex QR V1.00 © 2009

15 15 Assembly of protect frame Gap between locker on stretching screw and bar should be approx. 3 mm for required working tension. ZelFlex QR V1.00 © 2009

16 16 Assembly of protect frame Frame with stretched stencil from bottom side. ZelFlex QR V1.00 © 2009

17 17 Assembly of protect frame Your ZelFlex QR frame is ready to use! ZelFlex QR V1.00 © 2009

18 18 ZelFlex QR V1.00 © 2009 www.ZelFlex.com

19 19 © 2009 Thank you for your attention. LPKF Laser & Elektronika d.o.o. · Polica 33 · 4202 Naklo · Slovenia sales@lpkf.si · support@lpkf.si


Download ppt "1 V1.00 © 2009 ZelFlex QR Quick Released double-sided mechanical stretching frame Step by step User guide."

Similar presentations


Ads by Google