Kentucky River Lock and Dam No. 8 A Major Qualifying Project for Stantec Consulting Services Inc. Michael Kendall Karyn Sutter
2
Major Qualifying Project Stantec Project Center ◦ Project Advisors Professor Suzanne LePage Professor Frederick Hart ◦ Stantec Consulting Service Inc. Mentors Daniel Gilbert April Welshans Adam Hacker
3
LD 8 Foundation Improvement ◦ Karst Features ◦ Water Quantity and Quality Concerns ◦ Foundation Stability
4
Evaluate Existing Dam Conditions Develop Design Options Apply Evaluation Criteria to Design Options Create a Preliminary Design of Best Foundation Improvement Option
6
Boring Layout Water Pressure Tests Exploratory Borings by Geological Region
7
Materials ◦ Portland Cement ◦ Admixtures Design Techniques ◦ Grout Curtain ◦ Grout Cap
8
Secant WallsDiaphragm Walls
9
Design Selection ◦ Evaluated Existing Conditions ◦ Developed Three Design Options DesignDescription Design 1Grouting in all regions Design 2 Grouting in all regions, secant wall in region 2 Design 3Grouting in all regions, secant wall in region 2, 3 and 4 Design Options
10
Application of Evaluation Criteria ◦ Cost ◦ Environmental Permitting ◦ Risks Reduction in Seepage Foundation Damage ◦ Constructability Dewatering Site Access Design Creation
11
GroutingCut-off Walls RegionRecommended Grout Curtain Depth Elevation (NAVD88) Approx. Length @ 15° Inclination (ft.) Region 143072.5 Region 242578.0 Region 345352.5 Region 444377.5 RegionRecommended Cutoff Depths Elevation (NAVD88) Length (Ft.) Region 246535 Region 345545 Region 447535 Each Secant Shaft Designed with a 4 Ft. Diameter with a 1 Ft. Overlap on Each Side Two Row Curtain with 16 Ft. Space Between Rows and Injection Holes every 6 Ft.
12
Cost DesignTotal Cost Design 1: Grout Curtain Throughout $2,506,804 Design 2: Grout Curtain Throughout, Secant Wall in Region 2 $2,948,554 Design 3: Grout Curtain Throughout, Secant Wall Regions 2, 3 and 4 $5,024,554 Design Option Costs
13
Environmental ◦ Identical Permitting Requirements Risks ◦ Mostly Dependant on Grouting ◦ Seepage Reduction Crucial Constructability ◦ All Designs Practical ◦ Verifiability of Technique
14
Selected Design 2: Grout Curtain Throughout with a Secant Wall in Region 2 Design of Proposed Foundation Improvement
15
Highest Water Loss Observed through Region Two Favorable Cost to Permeability Reduction Ratio Practical Design