CEMEX REDWOOD CITY CEMENT TERMINAL EQUIPMENT UPGRADE & MODIFICATION PROJECT
2
RMC Pacific Materials Purchased The Terminal From Ideal Cement
CEMEX REDWOOD CITY CEMENT TERMINAL EQUIPMENT UPGRADE & MODIFICATION PROJECT RMC Pacific Materials Purchased The Terminal From Ideal Cement March 1, 2005 – CEMEX Officially Purchased RMC Standard Procedure During An Acquisition Includes Formation Of A Post Merger Integration (PMI) Team Evaluation Of Facility Operations And Procedures & Recommendations To Bring Facility In Compliance With CEMEX Standards Improve Operations, Safety, Environmental And Community Service Improve Customer Service.
3
CEMEX REDWOOD CITY CEMENT TERMINAL UPGRADE OBJECTIVES
Convert Storage Silo Dedicated For Fly Ash To Cement Truck Load-Out System Upgrade And Improvement Upgrade Existing Truck Loading System With Up To Date Equipment And Add An Additional Load-out Spout That Will Expedite Load Times By Half; Install A Second Two Spout Truck Loading System; & Centralize Nearly All Of The Cement Storage And Loading To One Vicinity Of The Terminal That Is Away From The Pacific Shores Complex.
4
CURRENT TERMINAL ENTERANCE & TRAFFIC PATTERN
5
PROJECT OVERVIEW Phase 1 Loadout System Phase 2 Loadout System
Stockhouse D Current Loadout
6
PROPOSED TRAFFIC PATTERN & LOADING SYSTEM LOCATIONS
New Traffic Pattern Phase 2 Loadout System Phase 1 Loadout System
7
PROPOSED IMPROVEMENT Artist conception of Phase 1 Modification
Modern 2 Nozzle Loadout System Replaces Single Nozzle system
8
PROPOSED IMPROVEMENT Artist conception of Phase 1 & 2 Modifications
Viewed Facing The New Phase 2 Loadout System Phase 2 Phase 1
9
PROPOSED IMPROVEMENT (cont.)
Move Truck Loading From The Small Bulk Tanks To Stock House – D; Utilize Four Storage Silos In Stock House – D As Both Storage And Load-Out; Replacing Inventory From Adjacent Silos Reduces Time Required To Re-fill System; Reduce Energy Consumption And Operating Cost; Reduce Truck Loading And Waiting Time; Installation Of Modern Equipment Minimizes Emissions;
10
PROPOSED IMPROVEMENTS (cont.)
Minimizes The Number Of Trucks Waiting On Seaport Blvd. Which Would Move Cement Trucks Inside The Terminal; Moves A Majority Of The Truck Loading Operations Away From Property Line Adjacent To Pacific Shores; Centralize Cement Storage – Minimize Transfer Of Cement From Stock House – D To Small Bulk Tanks Pave Roads Minimize Fugitive Dust During The Dry Season Minimize Mud Track Out During Wet Weather Season