Pecan Plantation Emergency Evacuation Routes
2
Pecan Plantation Comanche Peak Nuclear Plant Quicksilver Gas Plant Comanche Peak Evacuation Zones Plan calls for Pecan Residents to go to Cleburne
3
Existing Road Network Hwy. 167 Mambrino Hwy. (County Rd.) Hwy. 4 P.P. Comanche Peak Plant Quicksilver Gas Plant About 20 miles to Cleburne from front gate
4
TxDOT Evacuation Feasibility Study GRANBURY TxDOT Preferred Route Hwy 167 Pecan Plantation Comanche Peak Plant
5
Pecan Plantation HOOD CO. JOHN- SON CO. Front Gate Back Gate Sandy Beach Plantation Beach
6
Pecan Plantation to Cleburne CLEBURNE 19 miles
7
Road from Pecan Plantation to Routes 2331 and 4
8
Pecan Plantation Gas Drilling Service Road Aerial View Looking West
9
Proposed Crossing Looking East Road Ends
10
Proposed Crossing Looking West Plantation Beach Park
11
Population Pecan Plantation Sandy Beach
12
HOOD. SOMMERVELL JOHNSON Connection to Rt. 67 Rt. 67 Cleburne = 11 miles Glen Rose = 8 mi. 8 miles ~ 1 mi.
13
GasPlantGasPlant Connection to Rt. 67 (Perspective) 1 mile Pecan Gas Plant Cleburne 67 2174
14
Somervell Route Pecan Plantation Sandy Beach Park Well Pad
15
Possible Crossing - South from Sandy Beach Sandy Beach
16
HOOD. SOMMERVELL JOHNSON Connection to Rt. 67 Rt. 67 Photo 2 Photo 3
17
Gas Plant & Drilling Road - Photo 2
18
County Road 2118 - Photo 3
19
Johnson County Option Pave ~ 3.5 miles of private road to Brazos River (in Johnson Co....landowners opposed) Build bridge Connecting road and gate at Plantation Beach
20
Somervell County Option Pave ~1 mile of dirt road from the river to county road 2174 (in Hood Co.) Build bridge Connecting road and gate at Sandy Beach* * Sandy Beach is close to the most densely populated part of Pecan
21
Southwest Parkway is a planned tollway to connect Fort Worth's Central Business District at IH 30 with FM 1187 in Cleburne. The current project links IH 30 and Forest Park Boulevard to Altamesa Boulevard in the southwest region of the city...[finish by 2010]. Southwest Parkway Project