Coordinating public transport with land use and road infrastructure Investigating mechanisms involved in two Scandinavian urban projects Research Director Frode Longva Institute of transport Economics flo@toi.no
2
Page The objective Background The transportation sector is a major contributor to climate change Current measures are not sufficient to stop the negative effects The challenge: Need to transcend PT policies into a wider sustainable agenda Combing PT policies with issues of land use and road infrastructure Ultimately increases the complexity involved in policy making and coordination This paper: Examines the way PT measures are considered and implemented together with land use and road infrastructure policies In two Scandinavian urban areas: Trondheim and Helsingborg 2
3
Page The cases Trondheim: PT initiatives in the context of a policy package: The Environmental Transport package The municipality, the region/PTA and the Road administration Helsingborg: PT initiatives in the context of a partnership agreement: The Busvision The municipality, the region/PTA, the operator Similarities Seen as “upfront” in their PT solutions due to high actions taken towards reducing congestion and carbon dioxides Combines PT measures with infrastructure and/or land use measures to achieve them 3
4
Page What is policy coordination? Pressman&Wildavsky (1984): No suggestion for reform is more common than ”what we need is more coordination” No generally agreed-upon definition of coordination exists As a starting point: “instruments and mechanisms that aim to enhance the voluntary or forced alignment of tasks and efforts of organizations within the public sector” (Bouckaert et al 2010:16) The literature further separates between: Horizontal and vertical coordination Policy formulation and policy implementation 4
5
Page Coordinating mechanisms – moving beyond the formal instruments 5 Organisational coordination Complete contracting Incomplete contracting Discursive coordination Deployment; how? Actors; who? Strength; what? Authority - control - sanctions - incentives - trust - consensus
6
Page Organisational coordination Same, same: Both cases combine Working groups, administrative and political steering committees All parties involved But different: The organisations serve different purposes Trondheim: the committees have hierarchically superior positions Helsingborg: no pre-defined superior positions The strain of coordination is put on the consensus/equality based working groups in Helsingborg the authority based steering committee in Trondheim And same again: Land use included in policy formulation, excluded from organizational instruments in both cases 6
7
Page Complete contracting Authority mechanisms are replaced by control, sanctions and procedures of non-compliance Two cases: 1.The service contract from PTA to operator in Trondheim 2.The service contract from PTA to operator in Helsingborg Equal contractual arrangements despite functioning in different organizational surroundings Both are highly detailed, incentivized, one-sided contracts In line with aim of no operator involvement in Trondheim At stake with aims of mutual partnership in Helsingborg Complete contracting is less flexible and harder to adjust during the lifetime of the contract 7
8
Page Incomplete contracting Control/sanctions are replaced by negotiation and trust Two cases: 1.The Norwegian reward fund 2.The agreement between Helsingborg and the PTA The Norwegian reward fund from state to the region/municipality Specifies goals, financial obligations, monitoring forms etc However, the evaluation form is open for interpretations A vertical instrument spurring horizontal policy coordination The agreements in Helsingborg are more vague Evaluation through ongoing consultations and no sanctions Control through the ongoing cooperation in the working groups Contrast to the contractual clauses between the PTA and the operator 8
9
Page Discursive coordination Coordination through consensus building For the PT planner, coordination leads to a variety of new partners A variety of competencies and meeting of different knowledge claims. In Helsingborg, the inclusion of the operator revealed knowledge and power struggles with those of the PTA Initially, all involved parties were conceived equal The operator was not allowed to lead any working groups + unlevelled resources In Trondheim, the inclusion of the Road Administration revealed different cultures from those of the city planners and PTA Planning of road investments without sufficient PT improvements 9
10
Page Conclusion The findings calls for a system wide perspective: One mechanism may counteract another The chosen coordinating instruments may be at stake with policy formulation Land use was excluded in both cases Complete contracting hardly consistent with mutual partnerships Power structures may undermine policy coordination Unlevelled amount of resources and competencies Clashes of knowledge Hierarchical and network mechanisms may be mutually reinforcing Cooperation in working groups may require at strong authority based mechanism. A vertical mechanism may spur horizontal coordination, eg. Reward fund The findings stresses the importance of trust and cultural factors when designing the coordination process 10
11
Page So what? Goal achievement in both cases Sharp increase in PT patronage Do we need all these coordinating efforts? However: In both cases: Thanks to isolated PT measures In both cases: Infrastructure + land use endangers goal achievement What happens in the long run? More research is needed: On the effects and limits of coordination On the coordination problems and tensions which can exist between representatives of different planning sectors 11