Inventory Policy and Reorder Point Analysis KELLEY BESSETTE JOHN JOHNSON JEFF LITCHFIELD MATT RISKIN.

Similar presentations


Presentation on theme: "Inventory Policy and Reorder Point Analysis KELLEY BESSETTE JOHN JOHNSON JEFF LITCHFIELD MATT RISKIN."— Presentation transcript:

1 Inventory Policy and Reorder Point Analysis KELLEY BESSETTE JOHN JOHNSON JEFF LITCHFIELD MATT RISKIN

2 Branches/ Demand Centers Finished Cores Component Rebuild Centre Work in Process Old Cores DC

3 Finished Cores CRC Work in Process Old Cores DC Branch – a node in the network Demand Centre – any node in the network with demand over a critical number (5) parts per year These centres do carry inventory

4 Branches/ Demand Centers Finished Cores CRC Work in Process Old Cores DC Services the branches, and carries inventory for nodes with sales less than a critical value

5 Branches/ Demand Centers Finished Cores Work in Process Old Cores DC CRC This facility is located in Edmonton, and is responsible for refurbishing used cores Component Rebuild Centre

6 Branches/ Demand Centers Finished Cores CRC Work in Process Old Cores DC

7 Demand Centres Finished Cores CRC Work in Process Old Cores 4545

8 Finished Cores CRC Work in Process Old Cores 4545 Simulation of demand A variation of Croston's Intermittent Method

9 Finished Cores CRC Work in Process Old Cores 4545 Returning Cores Assign return time Update return time daily on a basis

10 Demand Centres CRC Work in Process Old Cores 4545 Refurbishing Assign processing time Track cores in process

11 Demand Centres Finished Cores CRC Work in Process Old Cores 4545 Distribution Where finished cores go Lead Time Track Cores en-route

12 Where to locate inventory Branch versus Distribution Centre Re-order point at each demand centres/distribution centres Number of cores in system Outputs of Model

13 Model Run Results Part Number: 6V5227 Store Number: 10

14 Potential Savings and Improvements

15 Project Accomplishments Development of a product that can be applied to 900 parts Simulating time event in Excel Model construction and implementation in a three month period

16 Questions? (Model Preview)