Download presentation
Presentation is loading. Please wait.
Published byAiyana Lightfoot Modified over 9 years ago
1
Why is Inventory Important?
2
Inventory at Successive Stocking Points
3
Water Tank Analogy Flow of Receipts (Raw Materials & Parts) Demand Flow (Finished Goods) Scrap or Reject Flow Inventory Level
4
Outflow exceeds Inflow Flow of Receipts (Raw Materials & Parts) Demand Flow (Finished Goods) Scrap or Reject Flow
5
Inflows exceed Outflows Flow of Receipts (Raw Materials & Parts) Demand Flow (Finished Goods) Scrap or Reject Flow
6
Types of Demand Independent Item’s demand is influenced ONLY by market conditions and is NOT related to production decisions for any other items. Only end items Demand must be forecast Examples –Cars, TVs, Bicycles, Number of Seats in a restaurant
7
Types of Demand Dependent Item’s demand derives from the production decisions of its parents. All intermediate and purchased items in manufacturing Demand should be derived Examples –Car doors, Tv remotes, Bicycle tires, Number of T-bones for a given night
8
A Bill of Materials A B(3) C(2) C(1) D(3) E(2) F(2) G(1)
9
Pressures for Small Inventories Interest/Opportunity Cost Storage and handling Property Taxes Insurance premiums Shrinkage Spoilage
10
Pressures for Large Inventories Customer Service Order/Setup Cost Labor/Equipment Utilization Transportation Cost Cost of Materials/Quantity Discounts
11
The Gaming Co.
12
How Much? When! When!
13
Economic Order Quantity Annual cost (dollars) Lot Size (Q)
14
Economic Order Quantity Annual cost (dollars) Lot Size (Q) Holding cost (HC)
15
Economic Order Quantity Annual cost (dollars) Lot Size (Q) Holding cost (HC) Ordering cost (OC)
16
Economic Order Quantity Annual cost (dollars) Lot Size (Q) Ordering cost (OC) Holding cost (HC) Total cost = HC + OC
17
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ
18
Economic Order Quantity Annual cost (dollars) |||||||| 50100150200250300350400 3000 — 2000 — 1000 — 0 — Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Lot Size (Q) Birdfeeder costs(Current System) C = (H) + (S) Q2Q2 DQDQ D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = 390 units
19
Economic Order Quantity Annual cost (dollars) |||||||| 50100150200250300350400 Lot Size (Q) 3000 — 2000 — 1000 — 0 — Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Birdfeeder costs (Current System) C = (H) + (S) Q2Q2 DQDQ D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = 390 units C = $2925 + $108 = $3033
20
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Birdfeeder costs C = (H) + (S) Q2Q2 DQDQ D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = 390 units C = $2925 + $108 = $3033
21
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ
22
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Birdfeeder costs (Optimal) D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = EOQ C = (H) + (S) Q2Q2 DQDQ EOQ = 2DS H
23
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Birdfeeder costs (Optimal) D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = 75 units C = (H) + (S) Q2Q2 DQDQ EOQ = 2DS H
24
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Birdfeeder costs (Optimal) D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = 75 units C = $562 + $562 = $1124 C = (H) + (S) Q2Q2 DQDQ EOQ = 2DS H
25
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Birdfeeder costs (Optimal) D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = 75 units C = $562 + $562 = $1124 C = (H) + (S) Q2Q2 DQDQ EOQ = 2DS H
26
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ Birdfeeder costs (Optimal) D = (18 /week)(52 weeks) = 936 units H = 0.25 ($60/unit) = $15 S = $45 Q = 75 units C = $562 + $562 = $1124 C = (H) + (S) Q2Q2 DQDQ EOQ = 2DS H Lowest cost Best Q (EOQ)
27
Economic Order Quantity |||||||| 50100150200250300350400 Annual cost (dollars) Lot Size (Q) 3000 — 2000 — 1000 — 0 — Current cost Lowest cost Best Q (EOQ) Current Q Total cost = (H) + (S) DQDQ Q2Q2 Holding cost = (H) Q2Q2 Ordering cost = (S) DQDQ
28
Five Assumptions of the EOQ CONSTANT demand rate Two relevant COSTS Item INDEPENDENCE CERTAINTY in demand, lead time and supply Whole LOTS
29
Realistic? No Way...................... BUT, since EOQ is relatively insensitive to errors, IT WORKS ANYWAY!
30
How Much? When! When!
31
Reorder Point On-hand inventory Time R Order received Q OH
32
Reorder Point On-hand inventory Order received Q OH Order placed IP TBO L R
33
Reorder Point On-hand inventory Time Order received Order received QQ OH Order placed Order placed IP TBO L L L R
34
Reorder Point Time On-hand inventory Order received Order received Q OH Order placed Order placed IP R TBO 1 TBO 2 TBO 3 L1L1 L2L2 L3L3
35
Reorder Point / Safety Stock Lower Florida Keys Health System Basic Surgery Cart Demand During Lead Time (units)100200300400500600 Probability0.100.150.200.250.250.05
36
Reorder Point / Safety Stock Lower Florida Keys Health System Basic Surgery Cart Demand During Lead Time (units)100200300400500600 Probability0.100.150.200.250.250.05 Cumulative Probability0.100.25.0450.700.951.00
37
Reorder Point / Safety Stock Lower Florida Keys Health System Basic Surgery Cart Demand During Lead Time (units)100200300400500600 Probability0.100.150.200.250.250.05 Cumulative Probability0.100.25.0450.700.951.00 Desired Cycle-Service Level = 95%
38
Reorder Point / Safety Stock Lower Florida Keys Health System Basic Surgery Cart Demand During Lead Time (units)100200300400500600 Probability0.100.150.200.250.250.05 Cumulative Probability0.100.25.0450.700.951.00 Desired Cycle-Service Level = 95% Reorder Point = 500 units
39
Reorder Point / Safety Stock Lower Florida Keys Health System Basic Surgery Cart Demand During Lead Time (units)100200300400500600 Probability0.100.150.200.250.250.05 Cumulative Probability0.100.25.0450.700.951.00 Desired Cycle-Service Level = 95% Reorder Point = 500 units
40
Reorder Point / Safety Stock Lower Florida Keys Health System Basic Surgery Cart Demand During Lead Time (units)100200300400500600 Probability0.100.150.200.250.250.05 Cumulative Probability0.100.25.0450.700.951.00 Desired Cycle-Service Level = 95% Reorder Point = 500 units Safety stock = Reorder point - DDLT DDLT= 100(0.10) + 200(0.15)... 600(0.05) = 355 units Safety stock = 500 - 355 = 145 units
41
Reorder Point / Safety Stock Probability of stockout (1.0 - 0.85 = 0.15) Cycle-service level = 85% Average demand during lead time zLzL R
42
Reorder Point / Safety Stock Demand during lead time = 36 units L = 15 Cycle/service level = 90% Time On-hand inventory R
43
Reorder Point / Safety Stock Demand during lead time = 36 units L = 15 Cycle/service level = 90% Time On-hand inventory R z = 1.28 Safety stock = z L = 19.2 20 Reorder point = 36 + 20 = 56
44
Reorder Point / Safety Stock Demand during lead time = 36 units L = 15 Cycle/service level = 90% Time On-hand inventory 56 z = 1.28 Safety stock = z L = 19.2 20 Reorder point = 36 + 20 = 56
45
Reorder Point / Safety Stock Demand during lead time = 36 units L = 15 Cycle/service level = 90% Time On-hand inventory 55 z = 1.28 Safety stock = z L = 19.2 19 Reorder point = 36 + 19 = 55 When L not given, but L and t are known: L = t L