Download presentation
Presentation is loading. Please wait.
Published byArjun Partin Modified over 9 years ago
2
Overview 1. (L1) Cascadia real-time GPS Station Network (PANGA + PBO) 2.(L2) GPS processing (phase+psuedorange data -> position estimates) 3.(L3) EEW products derived from rtGPS position streams 4.Example earthquakes as examples – 2010 Sierra El Mayor, 2010 Maule, 2011 Tohoku-Oki 5.GPS Cockpit Project: Managing rtGPS time series and derived products
3
Seattle M6-7 crustal faults not well known, <1m EEW M8-9: megathrust, <5m EEW
5
Latency: most data arrives in less than 1 second PANGA telemetered to CWU PBO telemetered to UNAVCO, then to CWU Arrival at CWUArrival at Boulder
6
Relative Positioning Absolute (Point) Positioning Higher relative precision Requires stable reference station Requires dense network Primarily commercial RTK Lower absolute precision (improving) Single station-capable Linear wrt station # Requires rt orbit + clock corrections Requires extensive data editing
7
-(1) Relative positioning: Trimble commercial product (joint w/ WSRN and OGRN RTK processing) -(2) Real-time GIPSY Point positioning: -(3) Developing standard GIPSY (not RTG) processing with clock and orbit correction streams from DLR (German Aerospace Center, Munich, Hauschild)
8
(Method 1) Trimble T4D operated jointly with WSRN & OGRN
9
Trimble T4D operated jointly with WSRN & OGRN
10
Method 2: JPL GDGPS RT-GIPSY SYSTEM (Bar-Sever)
11
Requires clock corrections streamed over Ntrip (DLR, IGS Method 3: CWU short-arc real-time processing with GIPSY
12
IGS Final Method 3: CWU real-time processing with GIPSY
13
-Requires extensive phase-level data QC -Less than 5s latency
14
BREW CNCR CABL TRND CHZZ ~10cm deviations are common in all methods
15
2010 Maule Chile M8.8 Mike Bevis, UNAVCO 4. Example Earthquakes
16
2010 Maule: Absolute point positioning of CONZ2010 Maule: Absolute point positioning of CONZ east north 3m
17
Sierra El Mayor, 4/4/2010Sierra El Mayor, 4/4/2010
18
Good agreement between GPS PP and Accelerometer Data
19
CWU, pp., 5 minutes http://www.panga.cwu.edu/events/baja/ PBO, relative p., 24+24 hr http://supersites.earthobservations.org/baja.php Absolute vs. relative positioning
20
pgDisplacement- 2010 Sierra El MayorpgDisplacement- 2010 Sierra El Mayor GPS PGDSeismic PGA
21
2011 Tohoku-Oki Earthquake GEONET GPS ARRAY
24
+15s: Seismic Detection NEIC W phase: M9.0 ~20 minutes
25
2011 Tohoku-Oki 3d GPS displacements (3x speed)2011 Tohoku-Oki 3d GPS displacements (3x speed)
26
+60s: Mw 8.47 GPS Moment Estimate
27
+90s: Mw 8.80 GPS Moment Estimate
28
+120s: Mw 9.04 GPS Moment Estimate
29
+180s: Mw 9.05 GPS Moment Estimate
30
+15s: Seismic Detection NEIC W phase: M9.0 ~20 minutes 60s:M8.590s:M8.8120s:M9.04
31
-Time Series viewer (interactive): negation of false positives -Data Aggregator (Perl, modular, talk to Craig Scrivner) -Many new derived products: -DefMaps -Inversions -GPS ShakeCast -Assimilation into seismic EEW not obvious
32
GPS Cockpit DefMap Slip
33
GPS Cockpit
35
Time for a demo!
36
Conclusions 1. Cascadia has mature real-time GPS networks (PANGA + PBO) 2.Data analysis is evolving rapidly 3.EEW products based on rtGPS position streams are also improving 4.Recent earthquakes show the importance of rtGPS in hazards monitoring 5.GPS Cockpit: First release on March 15
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.