Download presentation
Presentation is loading. Please wait.
Published byAsia Benningfield Modified over 9 years ago
1
LAND SUBSIDENCE AND EARTH FISSURES IN ARIZONA Ching Sheng, Seah (ID 4147549) Melanie Poller (ID 2106795) Nhu Quynh Thi Nguyen(ID 4112793)
2
Content Problems Geological Aspects Solutions
3
Earth fissure damage to residence in Nevada (photo by John Bell)
4
Fissure gully near Picacho, Arizona (Photo by S.R. Anderson, USGS)
5
Fissure gully crossing below above- grade pipe at a mine facility in Nevada (photo by AMEC presented in 2004 ADOT workshop) Central Main Lateral Canal of the CAP crossing the Picacho earth fissure (photo by Michael Carpenter)
6
SUMMARY OF THE PROBLEMS Increasing of all water use Warming climate RESULTS: Cracking of buildings Damage to roads, railway, storm sewers, underground pipelines,canals, etc. Cracks without advance warning
7
SUBSIDENCE Groundwater withdraw from aquifers in sedimentary basin Bowl-shaped depression EARTH FISSURES AND FISSURE GULLIES Cracks, seams or separations The sediment properties and stresses results in a subsurface rupture or separation Fissure Gullies: erosive forces move sediment downward
8
CRACK FORMATION Withdrawal of groundwater in the center Clay beds and other formations -thickest in the center - thinner toward the edges Overlying alluvium rotate (Herman Bouwer - Land Subsidence and Cracking Due to Ground – Water Depletion) SUBSIDENCE A B E F COMPRESSION D C
9
CRACK FORMATION Groundwater withdrawal - ridge - alluvial materials - thicker Linearly increasing subsidence Overlying slabs rotate (Herman Bouwer - Land Subsidence and Cracking Due to Ground – Water Depletion) COMPRESSIBLE BEDS COMPRESSION SUBSIDENCE CRACK
10
MONITORING AND POST CONSTRUCTION REMEDIAL ACTION Solution:
11
SUBSIDENCE MONITORING G eographic I nformation S ystem ( GIS ) + Close Range Photogrammetric System
12
G lobal P ositioning S ystem ( GPS ) Management tool S chedule I dentify E valuate
13
POST CONSTRUCTION REMEDIAL ACTION K eep W ater P ath A way from earth fissures Sealing of surface earth fissures + Diversion of Drainage Prevent erosion of surface flows -large gullies Solution: Clay + Bentonite mixed with soil + Soil cement (Good in treating Enlarged fissures) Filling with Gravel (less succesfull)
14
Using Cutoff Wall: Sheet Piling Cutoff Walls Water Path – Earth Fissure – deep – stability (Successful but hairline cracks developed) Geotextile Cutoff Barriers
15
THANK YOU!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.