Download presentation
Presentation is loading. Please wait.
Published byClifton Shires Modified over 9 years ago
1
RES G series TRAining CEntre Maintenance
2
Remove blast tube to check: Correct electrodes position Air nozzle position Fuel nozzle condition
3
Electrodes maintenance Unscrew the 2 screws Unscrew the two screws Extract the electrodes unit Disconnect the unit from the high voltage cables High voltage connection
4
Fuel nozzle maintenance Unscrew 3 screws Unscrew the three screws Remove the “cup”
5
Fuel nozzle maintenance Loosen the screw with the 2 mm hexagon wrenche
6
Remove the air nozzle Fuel nozzle maintenance
7
PTC maintenance Remove the sleeve “clicson” and electrical heating (PTC 150W) 4 screws Unscrews the 4 screws with 5 mm hexagon wrenche
8
Remove the nozzle holder unit Disconnect from hydraulic circuit Disconnect electrical connections PTC maintenance suggested
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.