Download presentation
Presentation is loading. Please wait.
Published byKailyn Girton Modified over 9 years ago
1
DCIM203
3
2002 1994
5
Timely, efficient and reliable delivery is needed Today is unsustainable Replacing ‘like with like’ is a poor investment We have an expanded mandate Investing in Information is the future 1 1 2 2 3 3 4 4 5 5
6
Data Vault Curves and Rates Mgr Reference Data Mgr Risk Mgr User Interface Mgr Treasury Mgr
7
Data Vault Curves and Rates Mgr Reference Data Mgr Risk Mgr User Interface Mgr Treasury Mgr
10
Treasury Accreditation and Certification Process for New Solutions Records Advisor Advice Review of information (Private) Risk Assessment for the project including environment Solution Design Engaged with GCSB Engaged with GCIO Hosting Options Assessment Business Needs Assessment GCIO Cloud Considerations Questionnaire Treasury Architecture Review Approval from GCIO Treasury Architecture Board Approval Approval from Treasury CITO GCSB Communication
15
Project kick-off July 2013 Start Development of C&R Start Azure Environment Build September 2013 GCIO Approval Jan 2014 Treasury Architecture Board Approval C&R Parallel Run in UAT April 2014 Start Development of Treasury Link May 2014 Curves and Rates into Production June 2014 Start Development of Risk Engine Security Review Treasury Link in Production Aug 2014 IT MS Partner Selected September 2014
34
Subscribe to our fortnightly newsletter http://aka.ms/technetnz http://aka.ms/msdnnz Free Virtual Hands-on Labs http://aka.ms/ch9nz Free Online Learning http://aka.ms/mva http://aka.ms/technetlabs Sessions on Demand
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.