Download presentation
1
ProjectWise Integration Server What’s New in V8i
Mark Hattersley Bentley Systems, Inc.
2
Agenda Overview of “Athens” Changes Demonstration Futures Questions
3
Major Themes for PW “Athens”
Distributed Projects Delta File Transfer Data Compression Read/write Web Parts New Web View Server product Geo-coordination Spatial navigation and searching Also addressed a number of usability and user requested enhancements
4
Delta File Transfer Improve Check in and Check out file transfer performance in distributed office environments Work with ANY type of file Leverage/strengthen existing PW technologies Uses well-known techniques for calculating differences between two copies of a file.
5
Time with DFT (seconds) Performance Increase with DFT
Delta File Transfer Exton to Eastern Europe check-in times (146ms latency) File types tested - DGNV8, PPTX, DWG2006 File File Size Time Without DFT (seconds) Time with DFT (seconds) Performance Increase with DFT File A 8MB 82.7 7.9 ~10x File B 4.5MB 51.2 6.8 ~7.5x File C 1MB 13.1 8.4 ~1.5x [Delta file transfer] Perhaps it is easier to see the benefits of DFT with a table. There are a lot of variables with DFT and it is hard to define a typical change, but here are some example results. We tested DGN, DWG, and office files between Pennsylvania and Lithuania. In general, the larger the file, the larger the performance gain – up to a 10x gain in this scenario. This makes sense because a typical edit should only change a small portion of the entire file. There is a binary algorithm beneath DFT, so this works for all file types. DFT means faster file transfers and more time to collaborate. 5
6
Data Compression Compression of the “database” information sent to/from ProjectWise Explorer/Admin Significantly reduces the size of the data sent, improving performance on low bandwidth/high latency connections Examples: Display all documents in a large folder(100/1000s of documents). initial login, Search results, etc
7
Web Parts Goals Provide a replacement for existing ProjectWise Web Explorer Lite Web Explorer Lite(WEL) will not be delivered with ProjectWise “Athens” Support either SharePoint 2007 or stand-alone IIS environments Provide a platform for customization
8
Web Parts Capabilities
Check out/in Document/Folder creation/deletion Multi-document operations Export/Send to Folder Component Display/Navigation Short-cuts to documents/folders(URLs) Design Compare Spatial Navigation
11
PW “Web View Server” The "ProjectWise Web View Server" will extend any ProjectWise deployment by providing individuals with web browser access to view ProjectWise managed content. This will make it easy for any number of connected users to access and view work in a read-only mode using Internet Explorer. And as the access is likely to be infrequent, and will always be to consume rather than collaborate on ProjectWise managed content, there will be no requirement for a user to possess a ProjectWise Passport.
12
PW “Web View Server” Leverages the same PW Web Parts in a read- only mode Able to support both read-only and read/write sites on same physical server Requires a server Right to Run license Requires PW Publishing Server for viewing of DGN/DWG data
14
Spatial Integration - Goals
Bentley Systems, Incorporated April 14, 2017 Spatial Integration - Goals Provide ability for users to associate spatial locations to documents/folders/projects Provide ability to visualize those locations on key maps Provide search mechanism to find documents/folders/projects based on their location. © 2005 Bentley Systems, Incorporated
15
Spatial Integration - Overview
Integrating subset of existing PW Geospatial Extension to core PW Automatically delivered in PW Admin and Explorer Advanced Geospatial features will be available as an add-on product Only two change to feature sets integrated into PW IS: Vector background maps can be created without PW Publishing Server Allow user to select background map used for search
16
ProjectWise Explorer Usability and User Requests
Quick Search Bar Photo Preview Back/Forward Folder buttons in PW Explorer File Sizes displayed in KB in Content List Launch PW Network Config from tools menu Multi-folder Drag-n-Drop New Progress Bar
17
ProjectWise Administrator Usability and User Requests
Datasource Statistics Select Users by Group in PW Admin User Login/out Audit Trail Log-out command in PW Admin Environment Format fields (date; date,day; date,sec) Date and Date,day only show date info Date,sec also includes time Increased upper file size limit was 2^32 bytes (~4 GB) now 2^64 bytes (too big for me to think about)
18
Overall Integration Improvements
Auto-login(SSO) for Integrated Applications Launch from desktop Icon without login dialog Local XML file used to track reference file changes(attach/detach) during checkout
19
AutoCAD Integration Improvements
AutoCAD 2008/2009 Integration and new features: Datalinks DGN reference DWF underlays Sheet Set Manager Integration Session File Manager Installer support for AutoCAD Vertical apps
20
MicroStation Integration Improvements
Managed Workspaces Conditionals(If, then, else) support UI improvements Project Macros(relative pathing from PW project root) MicroStation Athens support In-place Reference Activation Dynamic View etc
21
ProjectWise IS Athens Compatibility
Applications: MicroStation 8.11, 8.9.x, V8.5.x, V7.1.x PowerDraft 8.11, 8.9.4, V8.5.x, V8.1, V7.1.x ProjectWise Navigator 8.9.5 AutoCAD 2009, 2008, 2007, 2006, 2005, 2004, 2002, 2000 Microsoft Office 2007, 2003, XP, 2000 Project 2007, 2003, 2002, 2000 Visio 2007, 2003, 2002, 2000 Server Operating Sys: Windows 2000 Server Windows 2003 Server(32 and 64- bit) .NET 3.5 Databases: Oracle 9i Oracle 10g Oracle 11g SQL Server 2000 SQL Server 2005 Client Operating Sys: Windows 2000 Professional Windows XP Professional Windows Vista (32 and 64-bit)
22
Upgrade Path Must upgrade both clients and servers
Previous clients will not work with “Athens” Server Previous servers will not work with “Athens” clients Side-by-side PW Explorer and Admin installations supported with: ProjectWise V8 XM Edition ProjectWise V Edition ProjectWise V8.1 Requires use of versionswitch.vbs
23
Performance Improvements
Scan Refs Login Setting file and document security Search Synchronize users with Active Directory Integrated MicroStation actions (save, open, model create, model delete, close, change view) Reference file activities (attach, re-browse, detach) GeoPAK section creations
24
GeoPAK Performance Improvements
Operation of cutting 32 plan and profile sheets PW MS GEOPAK 32 files took 4 hr 9 min PW GEOPAK 32 files took 61 minutes
25
Futures Transmittal\Submittal workflow support Workflow
Application Integration ……..
26
Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.