Solar Energy : Here Comes the Sun!!! June 28, 2012
2
Hannah Solar Story 5-year-old Renewable Energy Solutions Provider Installed over 7 MW of solar capacity o Largest and Highest Commercial Roof Mounted array in Georgia Our team has 100 + years combined experience in the energy, electrical and construction industries Services include turnkey installation of roof, ground and tracking solar arrays as well as critical back-up power and EV charging infrastructure.
3
My Story University of Georgia Class of 2009 Work History o Insurance Payment Policy Management Company o Hannah Solar – Business Development – 1 Year mark last week » Collaborated on nearly 25 Solar Projects » Help companies and individuals hedge their energy costs for the future by owning their own utility
4
Common Solar Myths… Solyndra means bankruptcy for the entire industry… Different technology which couldn’t compete My lights will go out if it’s cloudy! 98% Grid – tied Solar is a fad… FedEx, UPS, eBay, Hewlett Packard Google, Apple and the U.S. Air Force Nellis Air Force Base 14 MW!!!
5
America’s Greatest Resource!
6
Solar Saves Us All Money! Energy prices are most expensive when demand is highest June – September 2pm – 7pm Solar energy production is highest during these peak demand times Solar reduces customer demand for the utility’s peak (most expensive) power which makes energy less expensive for all ratepayers
8
Solar - We Will Lead! The economics are in your favor, right now! THE ECONOMICS
9
Solar - We Will Lead! NEW NUKE IS GOING TO BE FAR MORE EXPENSIVE THAN SOLAR... FOR FAR LONGER... Nuclear Power is ‘Base Load’ delivered for approximately $.04 per kWh Vogtle 3&4 - $14,000,000,000 – 2,200 MW – 10+ Years to Build
10
Solar - We Will Lead! SOLAR & NUCLEAR COSTS – HISTORIC CROSSOVER Dr. John O. Blackburn & Sam Cunningham NC WARN: Waste Awareness & Reduction Network (July 2010)
11
2007 $8 /Watt Installed 100KW = $800,000 Generates 160,000 kWh/year 30 Year Generation = 4.8m Cost Per kWh = $.19/kWh * 2009 $6.25 /Watt Installed 100KW = $625,000 Generates 160,000 kWh/year 30 Year Generation = 4.8m Cost Per kWh = $.15/kWh * 2012 $3.50 /Watt Installed 100KW = $350,000 Generates 160,000 kWh/year 30 Year Generation = 4.8m Cost Per kWh = $.09/kWh * Delivered Cost per Kilowatt Hour (kWh) without incentives * Assumes 30 years of operation & maintenance and capital at 6%. Solar - We Will Lead! $450,000 (56%) price reduction in 5 years!
12
2012 $3.50 / Watt Installed 100KW = $350,000 Generates 160,000 kWh/year 30 Year Generation = 4.8m Cost Per kWh = $.09-$.11/kWh * Delivered Cost Per Kilowatt hour (kWh) with incentives * Assuming 30 years of operation, normal operational costs and capital at 6%. Federal Incentive: 30% = -$1.05 Depreciation: 25% = -$.875 Final Cost Per Watt Installed: $1.58 Cost Per kWh over 30 Years = $.033/kWh Solar - We Will Lead! Solar Has Reached Grid Parity!
13
Solar Options 12 Panel Tracker Lanier Tech 200 kW Ground Mount 30 kW Solar Canopy LOHR 355 kw Roof Mount HP 12 3 4
14
Hewlett Packard Data Center 355 kW Ballasted Flat Roof Array Panel Claw – Andover, Massachusetts 1,420 Mono-Crystalline Solar Panels Suniva - Norcross, Georgia Industrial Grade Inverter PV Powered – Portland, Oregon 21 days to install with local labor and electrical work Grid-Tied System on Georgia Power
15
Hewlett Packard Data Center Array will produce 17,000,000 kWh over 30 yrs. That is $.033 / kWh hedged for 30 years VS. peak rates of $.36 per kWh and RISING!!! 30 years of Savings: $2 - $5 M
16
100 kW Solar Array in Georgia 3 Year Cost Recovery!!!
17
Thank You Gwinnett Chamber of Commerce!