12/10/07 Mike Gilbert, Matt Williams, Tuan Huynh, Travis Pincoski Team GORE
2
Gore Confidential To design and fabricate a device or devices that will reduce the changeover time for the pleating machine. The designed solution must work for all CleanStream filter products and be integrated into the existing machines.
3
Gore Confidential Pleat Height Pleater Bed Pleat Assist Stripper Bar Bed
4
Gore Confidential
5
4 Critical Adjustments ◦ Pleater bed ◦ Stripper bar bed ◦ Setting pleat height ◦ Pleat assist At Least: ◦ 10 bolts ◦ 7 different tools
6
Gore Confidential Pleater Height (50%) ◦ 2 sides ◦ Iterative process ◦ Must be accurate Stripper Bar Bed (25%) ◦ Hard to adjust (friction and weight) ◦ Potential damage to other structures
7
Gore Confidential CustomerWants Operators More controlled adjustments Less tools required Safer* Easier access to adjustment sites Turn two adjustments into one Improve product accuracy Engineers Low Maintenance Reliability and durability Improved accuracy Less scrap Availability of parts Business Leaders Improved efficiency Reasonable cost/benefits Safer*
8
Gore Confidential Safety: Solution must keep operators and engineers out of harms way. Must also meet OSHA regulations. Cost: Solution must fit within Gore’s budget for this project. Machine Conditions: Solution must be able to fit on the current Chandler pleaters.
9
Gore Confidential
10
RankMetric Target Value 1Decrease in Changeover Time50% 2Increase of Filters Per Day+175 3Number of Hard to Move Parts2 4Number of Awkward Adjustment Sites1 5Number of Maintenances Per Year1 6Number of Tools Needed4 to 5
11
Gore Confidential Approx. 1 hr per pleat height changeover 170 changeovers per machine per year 3 machines 50% reduction = 255 production hours saved per year
12
Gore Confidential Scissor JackAutomatic Blade Pleater Popular tool (Automotive, aerospace, etc) Proven reliability, durability and strength Lightweight, cheap, etc. Fully automatic pleating machine High rate of production Expensive
13
Gore Confidential Not feasible with one concept ◦ Cost ◦ Time ◦ Resources Two Concepts 1.Moving both beds and holding the 1/8” gap 2.Setting pleat height
14
Gore Confidential Adjustable Bolt SpacerAssortment of Custom Spacers Caliper Spacer
15
Gore Confidential
16
MetricImportanceMultiplierCustom SpacerBolt SpacerCaliper Spacer Reduce Changeover Time11312 Less Adjustments20.5312 Cost30.4123 Reduce Number of Tools40.35123 Minimize Required Force50.3N/A Less Maintenances60.25213 SCORE:5.753.256 3 = Best, 2 = Moderate, 1 = Worst
17
Gore Confidential Caliper Spacer Design with slots for caliper
18
Gore Confidential Caliper Spacer Design with slots for caliper Locking system Alignment system Calibration system
19
Gore Confidential Designed to work with digital caliper Tolerance due to slip fit of alignment system Deformation due to loads are negligible ComponentsMaterial Alignment systemTool Steel Calibrated BracketsTool Steel Locking systemSteel
20
Gore Confidential Rack + Pinion Scissor Jack Threaded Rod Design
21
Gore Confidential
22
3 = Best, 2 = Moderate, 1 = Worst MetricImportanceMultiplierScissor JackThreaded RodRack/Pinion Reduce Changeover Time11123 Less Adjustments20.5231 Cost30.4123 Reduce Number of Tools40.35231 Minimize Required Force50.3231 Less Maintenances60.25231 SCORE:4.275.6
23
Gore Confidential
24
Gearing system Bearing system Structural Mounts Railing system
25
Gore Confidential Spacing of Railing Rods ACME Thread Rod Bearings Selection Gearing ComponentsMaterial Railing systemWear-resistant Steel Threaded RodSteel Structural Brackets and mountsWear-resistant Steel HardwareStainless Steel
26
Gore Confidential ItemDescriptionQuantityPriceTotal Threaded rodPrecision ACME threaded rod 1"-101 $ 150.00 Acme tapStraight Flute cut tap 1"-101 $ 165.00 Steel RodsWear-Resistant 4150 Alloy Steel 1"2 $ 67.00 $134.00 Stripper bar bracket1018 Carbon Steel1$165.00 Gear BoxSlide-Rite 2:1 Standard Series Right Hand1 $330.00 BearingFrelon Lined Linear bearing for rail system4 $50.00 $200.00 MiscellaneousBearings, hardware, etc--$350.00 Labor/Fabrication Cost8$50.00$400.00 TOTAL~$1800.00 ItemDescriptionQuantityPriceTotal Metal Plate4142 Alloy Steel Hardened (1” by 6” by 6”)2 $75.00 $150.00 Miscellaneous- 20.00 $20.00 Labor/Fabrication CostMachine custom components5 $50.00 $250.00 TOTAL ~$450.00 Total Cost = Under $2300 Bed Mover Spacer (x2)
27
Gore Confidential Custom Machine work ◦ Low quantity ◦ High precision ◦ Adaptability Off-the-Shelf Parts ◦ Stock rods ◦ Bearings (linear, roller) ◦ ACME rod ◦ Gearbox
28
Gore Confidential 1. Structure mounts and brackets Linear and roller bearings pressed fit beforehand 2. Thread in ACME rod 3. Attach gearbox, crankshaft, and hand wheel
29
Gore Confidential Changeover Time Test ◦ 3 Team Members Each Performed 3 Trials Average time of 3 rd trial will designate the new time of the changeover ◦ One operator Performed only one test due to time constraints Results used to “bridge gap” between team tests to what Gore can expect ◦ Basis for Comparison Time of 62 minutes will be used as benchmark for time reduction
30
Gore Confidential Target Time (31 Mins)
31
Gore Confidential All 10 trials were well below target value of 31 mins. 3 rd Trial Times ◦ Mike: 18:14 ◦ Matt: 17:14 ◦ Tuan: 18:35 Team Average = 18:01 => 70% Reduction Gore Operator had time of 18:10 ◦ Times should improve as well, therefore Gore can expect roughly 70% improvement when system is fully implemented.
32
Gore Confidential RankMetric Target Value Testing Value 1Decrease in Changeover Time50%70% 2Increase of Filters Per Day+175+245* 3Number of Hard to Move Parts20 4Number of Awkward Adjustment Sites11 5Number of Maintenances Per Year1Unknown 6Number of Tools Needed4 to 55 * Anticipated Value
33
Gore Confidential Projected Percentage of Time Reduction: Approx. 56% Actual Tested Percentage of Time Reduction: 70% *Time in Minutes Step #AdjustmentCommentsOriginal TimeProjected TimeNew Time 1 Loosen Set Screws 2:000:001:45 2 Loosen Lock NutNEW0:001:000:11 3 Loosen Pleat Assist 2:00 1:50 4 Move Beds 15:00-20:003:00-5:00 0:49 5 Set Pleat Assist Gap ELIMINATED5:000:00 6 Set Pleat Assist 5:00 4:46 7 Tighten Pleat Assist 2:00 2:01 8 Secure Lock NutNEW0:001:000:20 9 Tighten Set Screws 2:000:001:46 10 Loosen Pusher Bar 2:00 0:42 11 Set Pusher Bar 20:00-25:008:00-12:00 2:07 12 Tighten Pusher Bar 2:00 1:44 Totals: 57:00 - 67:0026:00-32:0018:01
34
Gore Confidential Bed mover was removed from pleater after testing Further testing required for manufacturing implementation ◦ Additional time testing required ◦ Additional alignment testing required Solidworks drawings provided to Gore Training materials created
35
Gore Confidential Sponsor: Craig Livingston Advisor: Dr. Michael Keefe Engineers: Julia Levinson, Steve Stark Operations: Mark Cotter, Dave Burnham Machinists: Dave Pierce, Sebastian Giambanco, Brian Villanueva