Presentation is loading. Please wait.

Presentation is loading. Please wait.

Training Meeting Insert Date c/LTC Hritz c/CSM Delk.

Similar presentations


Presentation on theme: "Training Meeting Insert Date c/LTC Hritz c/CSM Delk."— Presentation transcript:

1 Training Meeting Insert Date c/LTC Hritz c/CSM Delk

2 Agenda S1-S4 Shop Briefs & S5-S9/PAO Calendar Significant Events * Event 1 * Event 2 * Event 3 * Etc. Lab discussion (T+6 – T+1) T-1 Assessment Command Staff Briefs

3 S-1: Unexcused Absence(s): 20 NOV 2013 – PT – Delk – Late Excused Absence(s): 18/20 NOV 2013 – PT – Erb – LASIK 18 NOV 2013 – Kluesener – PT – Bold Warrior 18 NOV 2013 – Rahm – PT – Bold Warrior 18/20 NOV 2013 – Lockie – PT – Employment 18/20/21 NOV 2013 – Burt – PT – Adrian College 18/20/21 NOV 2013 – Walters – PT – Adrian College Total Attendance Data: MSL I: 12 PT MSL II: 10 PT MSL III: 8 PT MSL IV: 18 PT The attendance data for the Rocket Battalion’s Dining-In (21 NOV 2013) will be sent forward no later than 1800 on 22 NOV 2013. S1 – Current Project(s): 1.Rocket Battalion – Awards Distribution: This task will be completed no later than 28 NOV 2013. The previously outlined course of action was discarded due to simple time constraints. 1.Updated MSL Rosters: Starting on 25 NOV 2013, I will begin working on the tentative MSL attendance rosters for the Spring 2014 academic term.

4 S-2: Weather Report S-2: Weather Report Effects of the Weather PT: Mostly cloudy all week with chances of rain increasing later in week. Temperatures steadily low 30s. LAB: 60% chance of rain. Ensure cadets bring appropriate gear. *Weather accurate as of 061400NOV2013

5 S-2: Crime Report S-2: Crime Report Week of 20OCT2013 Crime Data (Source: Toledo Blade - ~2 mile radius around UT Campus) 11 Burglaries (Dark Red) +6 2 Thefts (Pink) +1 1 Robberies (Purple) -1 1 Felonious Assault (Green) +0 Notes: -6 more crimes in comparison to last week. -2 crimes located to south west of campus near Byrnes and Oasis. Week of 27OCT2013 Crime News No UT Alerts or reported news My Chances of Being a Victim: Toledo: Violent Crimes: 1 in 99 Ohio Violent Crimes: 1 in 325 Toledo Property Crimes: 1 in 17 Ohio Property Crimes: 1 in 30

6 S-3: Task Tracker

7 S-4: Logistics Report S-4: Logistics Report UPDATES -Issued all cold weather gear at first lab -Need supply SGTs for each company

8 Battalion Staff Updates S5/S7 S6 PAO

9 MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN 1234/5 6789 Bring a Friend to PT Lab 1 Forming Squads 10 0800 Training Meeting 11/12 13141516 Lab 2 Squad Attack 17 0800 Training Meeting 18/19 20 Martin Luther King, Jr. Day No Classes 21 2223 Lab 3 24 0800 Training Meeting 25/26 2728293031 0800 Training Meeting 1/2 January 2014

10 MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN 34567 0800 Training Meeting 8/9 1011121314 0800 Training Meeting 15/16 1718192021 0800 Training Meeting 22/23 2425 26272801/02 345678/9 February 2014 Spring Break

11 T+6 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland T+6 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland OIC’S INTENT: To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter. CONCEPT OF THE OPERATION: Phase I: Planning Phase II: Setup Phase III: Execution of Lab a. Push-up Eventc. 2 Mile Run b. Sit-up Eventd. Height/Weight Phase IV: Recovery / AAR INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center. UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

12 Task Matrix NameRehearsalsSetup DetailDuring ExecutionRecovery Akers Annis Burt Delk Diaz Erb Gardull Hritz Kenny Kluesener Lockie Mains McCord Rahm Scere Schoonover Vail Walters Williamson Wineland Cadre Needsi.E (Transportation to and from Miakonda)

13 Timeline TimeEvent 0515MSIV’s Arrive 0515-0530Setup (move mats, gather equipment, etc.) 0530MSI’s, II’s, III’s arrive 0530-0540MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats 0540-0545Push-up event brief 0545-0555Push-up event execution (4*2.5 = 10 minutes) 0555-060510 minute rest and Sit-up event brief 0605-0615Sit-up event execution (4*2.5 = 10 minutes) 0615-06302 Mile Run event brief and movement to UT Bike Trail 0630-06502 Mile Run event execution 0650-0700Movement to HEC 0700-0720Height and weight measurement 0720Dismissal

14 Lab Tracker

15 T+5 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland T+5 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland OIC’S INTENT: To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter. CONCEPT OF THE OPERATION: Phase I: Planning Phase II: Setup Phase III: Execution of Lab a. Push-up Eventc. 2 Mile Run b. Sit-up Eventd. Height/Weight Phase IV: Recovery / AAR INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center. UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

16 Task Matrix NameRehearsalsSetup DetailDuring ExecutionRecovery Akers Annis Burt Delk Diaz Erb Gardull Hritz Kenny Kluesener Lockie Mains McCord Rahm Scere Schoonover Vail Walters Williamson Wineland Cadre Needsi.E (Transportation to and from Miakonda)

17 Timeline TimeEvent 0515MSIV’s Arrive 0515-0530Setup (move mats, gather equipment, etc.) 0530MSI’s, II’s, III’s arrive 0530-0540MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats 0540-0545Push-up event brief 0545-0555Push-up event execution (4*2.5 = 10 minutes) 0555-060510 minute rest and Sit-up event brief 0605-0615Sit-up event execution (4*2.5 = 10 minutes) 0615-06302 Mile Run event brief and movement to UT Bike Trail 0630-06502 Mile Run event execution 0650-0700Movement to HEC 0700-0720Height and weight measurement 0720Dismissal

18 Lab Tracker

19 T+4 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland T+4 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland OIC’S INTENT: To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter. CONCEPT OF THE OPERATION: Phase I: Planning Phase II: Setup Phase III: Execution of Lab a. Push-up Eventc. 2 Mile Run b. Sit-up Eventd. Height/Weight Phase IV: Recovery / AAR INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center. UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

20 Task Matrix NameRehearsalsSetup DetailDuring ExecutionRecovery Akers Annis Burt Delk Diaz Erb Gardull Hritz Kenny Kluesener Lockie Mains McCord Rahm Scere Schoonover Vail Walters Williamson Wineland Cadre Needsi.E (Transportation to and from Miakonda)

21 Timeline TimeEvent 0515MSIV’s Arrive 0515-0530Setup (move mats, gather equipment, etc.) 0530MSI’s, II’s, III’s arrive 0530-0540MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats 0540-0545Push-up event brief 0545-0555Push-up event execution (4*2.5 = 10 minutes) 0555-060510 minute rest and Sit-up event brief 0605-0615Sit-up event execution (4*2.5 = 10 minutes) 0615-06302 Mile Run event brief and movement to UT Bike Trail 0630-06502 Mile Run event execution 0650-0700Movement to HEC 0700-0720Height and weight measurement 0720Dismissal

22 Lab Tracker

23 T+3 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland T+3 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland OIC’S INTENT: To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter. CONCEPT OF THE OPERATION: Phase I: Planning Phase II: Setup Phase III: Execution of Lab a. Push-up Eventc. 2 Mile Run b. Sit-up Eventd. Height/Weight Phase IV: Recovery / AAR INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center. UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

24 Task Matrix NameRehearsalsSetup DetailDuring ExecutionRecovery Akers Annis Burt Delk Diaz Erb Gardull Hritz Kenny Kluesener Lockie Mains McCord Rahm Scere Schoonover Vail Walters Williamson Wineland Cadre Needsi.E (Transportation to and from Miakonda)

25 Timeline TimeEvent 0515MSIV’s Arrive 0515-0530Setup (move mats, gather equipment, etc.) 0530MSI’s, II’s, III’s arrive 0530-0540MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats 0540-0545Push-up event brief 0545-0555Push-up event execution (4*2.5 = 10 minutes) 0555-060510 minute rest and Sit-up event brief 0605-0615Sit-up event execution (4*2.5 = 10 minutes) 0615-06302 Mile Run event brief and movement to UT Bike Trail 0630-06502 Mile Run event execution 0650-0700Movement to HEC 0700-0720Height and weight measurement 0720Dismissal

26 Lab Tracker

27 T+2 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland T+2 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland OIC’S INTENT: To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter. CONCEPT OF THE OPERATION: Phase I: Planning Phase II: Setup Phase III: Execution of Lab a. Push-up Eventc. 2 Mile Run b. Sit-up Eventd. Height/Weight Phase IV: Recovery / AAR INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center. UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

28 Task Matrix NameRehearsalsSetup DetailDuring ExecutionRecovery Akers Annis Burt Delk Diaz Erb Gardull Hritz Kenny Kluesener Lockie Mains McCord Rahm Scere Schoonover Vail Walters Williamson Wineland Cadre Needsi.E (Transportation to and from Miakonda)

29 Timeline TimeEvent 0515MSIV’s Arrive 0515-0530Setup (move mats, gather equipment, etc.) 0530MSI’s, II’s, III’s arrive 0530-0540MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats 0540-0545Push-up event brief 0545-0555Push-up event execution (4*2.5 = 10 minutes) 0555-060510 minute rest and Sit-up event brief 0605-0615Sit-up event execution (4*2.5 = 10 minutes) 0615-06302 Mile Run event brief and movement to UT Bike Trail 0630-06502 Mile Run event execution 0650-0700Movement to HEC 0700-0720Height and weight measurement 0720Dismissal

30 Lab Tracker

31 T+1 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland T+1 Insert Date Event OIC: c/LTC Hritz – AOIC: c/MAJ Wineland OIC’S INTENT: To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter. CONCEPT OF THE OPERATION: Phase I: Planning Phase II: Setup Phase III: Execution of Lab a. Push-up Eventc. 2 Mile Run b. Sit-up Eventd. Height/Weight Phase IV: Recovery / AAR INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center. UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

32 Task Matrix NameRehearsalsSetup DetailDuring ExecutionRecovery Akers Annis Burt Delk Diaz Erb Gardull Hritz Kenny Kluesener Lockie Mains McCord Rahm Scere Schoonover Vail Walters Williamson Wineland Cadre Needsi.E (Transportation to and from Miakonda)

33 Timeline TimeEvent 0515MSIV’s Arrive 0515-0530Setup (move mats, gather equipment, etc.) 0530MSI’s, II’s, III’s arrive 0530-0540MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats 0540-0545Push-up event brief 0545-0555Push-up event execution (4*2.5 = 10 minutes) 0555-060510 minute rest and Sit-up event brief 0605-0615Sit-up event execution (4*2.5 = 10 minutes) 0615-06302 Mile Run event brief and movement to UT Bike Trail 0630-06502 Mile Run event execution 0650-0700Movement to HEC 0700-0720Height and weight measurement 0720Dismissal

34 Lab Tracker

35 T-1 Assessment Planning: Issue: We were originally given such a short notice (one month) of the possibility of competing in the Norwegian Foot March. Discussion: Due to such a short suspense, our training time was severely reduced, which hindered us from reaching our full potential in securing a record time for completing 18.6 miles. Recommendation: We will begin planning in January, and begin training early next year in order to bring multiple teams to participate and achieve better results in November (2014). Preparation: Issue: While we were prepared to complete the 18.6 mile distance in 4:09 (twenty-one minutes under the standard of 4:30), our time could have been drastically reduced if we trained well ahead of time. Discussion: Our training capacity was reduced due to such a short suspense, which slowed down our completion time as a result. Recommendation: I recommend that we begin training well ahead of time—at least three months before the actual event next November.

36 T-1 Assessment Preparation con’t: Issue: We were originally given such a short notice (one month) of the possibility of competing in the Norwegian Foot March. Discussion: Due to such a short suspense, our training time was severely reduced, which hindered us from reaching our full potential in securing a record time for completing 18.6 miles. Recommendation: We will begin planning in January, and begin training early next year in order to bring multiple teams to participate and achieve better results in November (2014). Execution: Issue: While we were prepared to complete the 18.6 mile distance in 4:09 (twenty-one minutes under the standard of 4:30), our time could have been drastically reduced if we trained well ahead of time. Discussion: Our training capacity was reduced due to such a short suspense, which slowed down our completion time as a result. Recommendation: I recommend that we begin training well ahead of time—at least three months before the actual event next November.

37 CLC Prep Officer Progress Report CLC Prep Officer Progress Report

38 Conditioning Platoon Commander’s Intent: All cadets that have failed any section of their APFT, are injured, or have weight issues will report to conditioning platoon to work on physical performance in order to pass the APFT T+1 Training: Monday: Insanity Wednesday: Insanity Thursday: Insanity Army Physical Fitness Updates: Physical assessment cards are completed AAR: Continue to improve on PRT Encourage cadets to show up to PT consistently

39 Alpha Company Commander’s Intent:T+1 Training: T-1 AAR:Issues:

40 Bravo Company Commander’s Intent:T+1 Training: T-1 AAR:Issues:

41 Recon Platoon Commander’s Intent:T+1 Training: T-1 AAR:Issues:

42 Marksmanship Team Commander’s Intent:T+1 Training: T-1 AAR:Issues:

43 Varsity Rifles Troop L-1 Commander’s Intent:T+1 Training: T-1 AAR:Issues:

44 Battalion Command

45 Cadre


Download ppt "Training Meeting Insert Date c/LTC Hritz c/CSM Delk."

Similar presentations


Ads by Google