Download presentation
Presentation is loading. Please wait.
Published byBrandi Atkin Modified over 9 years ago
1
1 Light 1 C 70” Project Layout AFF
2
AFF is the abbreviation for 2 1.After first fire 2.Above finished floor 3.Above flat floor 4.At first floor 5.Average floor finish
3
Project Layout 3 Light 1 C 70” AFF
4
C is the abbreviation for 4 1.Clear left 2.Center low 3.Clear line 4.Center line 5.Correct line
5
5 your
6
How many screws are needed when installing a box 6 1.4 2.3 3.5 4.2 5.1
7
7 EYE HOOKS
8
The proper direction of an eyehook is 8 1.To the left and up 2.To the right and up 3.To the left and down 4.To the right and down 5.To the left then to the right
9
9 Supporting your cable
10
Staples shall be installed 10 1.12 inches from a box and 3-1/2 feet thereafter 2.8 inches from a box and 4- 1/2 feet thereafter 3.12 inches from a box and 4-1/2 feet thereafter 4.10 inches from a box and 4 feet thereafter 5.12 inches from a box and 4 feet thereafter
11
11 Cutting your EMT
12
After you cut your pipe, you shall 12 1.Polish the pipe 2.Ream the pipe 3.Install the pipe 4.Measure the pipe 5.File the pipe
13
Connecting your Devices 13 SILVER screws
14
SILVER terminal screws are for 14 1.Black wires 2.Green wires 3.Yellow wires 4.Red wires 5.White wires
15
Connecting your Devices 15 BRASS screws
16
BRASS terminal screws are for 16 1.Black wires 2.Green wires 3.Yellow wires 4.Red wires 5.White wires
17
17 Lock-nut NM cable Box connector Sheathing in the Box
18
How much sheathing shall be visible inside your box at the box connector 18 1.¼ inch 2.½ inch 3.1/8 inch 4.¾ inch 5.5/8 inch
19
Connecting your Devices 19 GREEN screws
20
GREEN terminal screws are for 20 Yellow wires Green wires Red wires Bare wires White wires
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.