General Notes Site clearing billed in m 2 & includes trees ≤0.5 m girth measured 0.5 m above ground Tree removal billed starting at >0.5 m ≥1m girth and every 0.5 m girth thereafter Surface excavation is billed in m³ with the area stated in m 2 Differing widths of trench excavation may be billed as one item starting at ≤ 1 m deep and 1 m increments thereafter Pier holes are billed in m with the volume stated in m 3
6
Page 19&20
9
Page 16
10
Y=3.4 X=0.3 X=3.1 Y=3.4 OR 16.00 + X/Y x rise =16.00 + 0.3/3.4 x rise =16.03 Page 17
12
Page 18
13
Page 22&23 A B 12 43 5 6 7