Download presentation
Presentation is loading. Please wait.
Published bySammy Bufford Modified over 9 years ago
1
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi, Giovanni P., Wander, Messi, Dane’, Marco, Santoni, Landi, Murtas M1R4 chamber installation continued on A and C front sides: 31 chambers installed last week!!! Alignment of close supports on back A and C sides completed ready to install chambers here also M1C central part cable rearrangement completed – back sides missing Chamber testing has started – see Fernando presentation Measured the position of the top alignment bars HV cables connected to CAEN PS and tested successfully A side closed Friday afternoon for two weeks for CALO works Continued timing test on M2-M5, 23 more channels recovered, 250 to go (1.5% of the total)
2
02-Mar-09A. Cardini / CERN & INFN2 Muon Detector Plans (week 10: Mar 2 nd Mar 6 th ) Present: Burkhard, Ale, Thomas, Nikolai, Oleg, Sasha, Francesco, Fernando, Maria Luisa, Landi, Santoni, Stas, Messi Continue installing R4 (+ some R3) chambers on C front (today) and back (from tomorrow) Proposal to postpone the removal of the top of the structure on C-side beginning next week: –Recover ½ day delay accumulated last week caused by lift problems –Optimal use of manpower this week Continue test on A and C sides –Debug problematic chambers –Start connectivity test –Start connecting chambers to gas system, now in open mode for this reason M1 CAEN HV testing (with cables) on C side GEM gas system leak test at 5 mbar Continue M2-M5 timing tests
3
02-Mar-09A. Cardini / CERN & INFN3 M1A closed
4
02-Mar-09A. Cardini / CERN & INFN4 M1C front
5
02-Mar-09A. Cardini / CERN & INFN5 M1C front
6
02-Mar-09A. Cardini / CERN & INFN6 M1C front alignment bar
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.