Download presentation
Presentation is loading. Please wait.
Published byDillan Prentice Modified over 9 years ago
1
Tree-trimming Standards and Practices City Council Work Session November 19, 2007
2
Introduction Two General Categories - Transmission - Distribution Work Performed by Outside Contractor - ANSI A300 (Tree Care Operations – Tree, Shrub, and other Woody Plant Maintenance – Standard Practices) - Interpretation and Implementation of A300 - Line clearances to GP&L standards Line Clearances - Transmission Standard (GP&L OH-907) - Distribution Standard (GP&L OH-908)
3
Transmission Standards Overview Subject to NERC Standard FAC-003-1 Lists ANSI A300 as industry “best practice” for vegetation management Transmission Vegetation Management Program (TVMP) per FAC-003-1 Passed ERCOT/NERC audit this year Liable for ALL vegetation related outages Increased penalties under nodal market
4
GP&L Standard OH-907
5
Typical Transmission Standard Zones defined by the TVMP - Border zone requires documented plan - Wire zone requires immediate resolution
6
New Transmission Design New transmission design increases clearances
7
Transmission Standards Outlook Development along transmission corridors - Increase compliance effort - Increase in vegetation encroachments - Increase interaction with property owners Reduce this impact by providing information to property owners along transmission corridors. Improve corridor access to insure timely identification of potential encroachments.
8
Distribution Standards Overview Majority of annual trimming operations Not currently subject to regulatory audits Line clearances per GP&L OH-908 Contractor adheres to ANSI A300 for vegetation management Trimming format (V-out, side, notch, etc.) chosen to provide desired clearances without killing tree. Trunk location typically dictates trim format
9
GP&L Standard OH-908
10
Distribution Standards V-Out Format
11
Distribution Standards Side Format
12
Distribution Standards Notch Format
13
Distribution Standards Outlook NERC regulatory voltage will continue to be lowered – distribution may be subject to standards in the near future? Increased trimming in past 3-5 years – greatly reduced storm related outages System reliability directly affected by magnitude of trimming operation Enhance customer notification process Provide information on clearance requirements to property owners
14
QUESTIONS ? Balancing aesthetics & reliability!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.