When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both inside and outside.
2
The gutters are formed in this machine and cut to length
3
Fixing brackets are fitted in place
4
Outlet holes are fitted in place
5
The gutters are fixed in position
6
The down pipes are finally placed in position
7
The painters finish the ceilings
8
The painter can give the walls a first coat before the joiner starts work
9
The plumber fits the hot water tank
10
He also fixes the boiler in position
11
Sometimes adding an extra radiator is required
12
The electrician can place all the plugs and switches
13
Smoke alarms are fitted. The dust cap stays on until the house is cleaned
14
Light fittings are also fixed in position
15
The wall tiler first puts adhesive on the walls
16
Tiles are placed in position using spacers
17
Finally they are grouted
18
Borders are used if requested
19
The wall tiler leaves a space for the architrave to be fitted
20
Certain floors are tiled and grouted
21
The finished floor